<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.0 20120330//EN" "http://jats.nlm.nih.gov/publishing/1.0/JATS-journalpublishing1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" article-type="research-article" xml:lang="en">
<front>
<journal-meta>
<journal-id journal-id-type="publisher-id">SJPA</journal-id>
<journal-title-group>
<journal-title>Scandinavian Journal of Public Administration</journal-title>
</journal-title-group>
<issn pub-type="epub">2001-7413</issn>
<issn pub-type="ppub">2001-7405</issn>
<publisher><publisher-name>School of Public Administration, University of Gothenburg</publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="publisher-id">sjpa.V29I4.40354</article-id>
<article-id pub-id-type="doi">10.58235/sjpa.V29I4.40354</article-id>
<article-categories>
<subj-group xml:lang="en">
<subject>Research article</subject>
</subj-group>
</article-categories>
<title-group>
<article-title>Context Adaptation in Public Administration Change Processes: A Case Within the Swedish Transport Administration</article-title>
</title-group>
<contrib-group content-type="authors">
<contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0009-0005-6909-2825</contrib-id><name><surname>Ekendahl</surname><given-names>Paulina</given-names></name><xref ref-type="aff" rid="aff1">1</xref></contrib>
<contrib contrib-type="author" corresp="no"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0003-0051-4928</contrib-id><name><surname>B&#x00E4;ckstr&#x00F6;m</surname><given-names>Izabelle</given-names></name><xref ref-type="aff" rid="aff2">2</xref></contrib>
<contrib contrib-type="author" corresp="no"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-5201-9809</contrib-id><name><surname>Norrman</surname><given-names>Andreas</given-names></name><xref ref-type="aff" rid="aff3">3</xref></contrib>
<aff id="aff1"><bold>Paulina Ekendahl</bold>, is a PhD. Student at the Faculty of Engineering at Lund University, Sweden and has an MSc. degree in Civil Engineering from Lund University. She is also a Business developer at the Swedish Transport Administration, facilitating change initiatives within traffic management. Paulina has a working background as a consultant and project manager in state, municipal and private organizations. Her research interests include organizational change, change management and context adaptation in public organizations.</aff>
<aff id="aff2"><bold>Izabelle B&#x00E4;ckstr&#x00F6;m</bold>, is a senior lecturer and researcher at Lund University, Sweden. She holds a PhD in Industrial Engineering and Management. Dr. B&#x00E4;ckstr&#x00F6;m&#x2019;s research interests include innovation management, change management and leadership. She is particularly curious about non-R&#x0026;D innovation and new forms of collaboratively organizing innovation in public and private organizations.</aff>
<aff id="aff3"><bold>Andreas Norrman</bold>, is a Professor of supply chain structure and organization at Lund University, Sweden. He has worked as a Management Consultant at A.T. Kearney, and he has been an Adjunct or Visiting Professor at universities in Thailand, Belgium and Finland. His research interests include supply chain risk management, omni-channel logistics, supply chain incentive alignment and change management. His work is published in leading SCM journals, and he has received multiple Emerald Highly Commended Awards for his work with IJPDLM, both as an author and a reviewer. He is a Fellow of the Royal Physiographic Society (the Academy for the Natural Sciences, Medicine and Technology) and serves as Senior Editor for Journal of Business Logistics. At Lund University, he has been awarded Excellent Teaching Practice.</aff>
</contrib-group>
<pub-date pub-type="epub"><day>19</day><month>12</month><year>2025</year></pub-date>
<pub-date pub-type="first-pub"><day>04</day><month>11</month><year>2025</year></pub-date>
<pub-date pub-type="collection"><year>2025</year></pub-date>
<volume>29</volume>
<issue>4</issue>
<fpage>1</fpage>
<lpage>28</lpage>
<permissions>
<copyright-year>2025</copyright-year>
<copyright-holder>&#x00A9; 2025 Paulina Ekendahl, Izabelle B&#x00E4;ckstr&#x00F6;m, Andreas Norrman</copyright-holder>
<license license-type="open-access" xlink:href="https://creativecommons.org/licenses/by/4.0/">
<license-p>This is an Open Access article distributed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (<ext-link ext-link-type="uri" xlink:href="http://creativecommons.org/licenses/by-nc/4.0/">http://creativecommons.org/licenses/by-nc/4.0/</ext-link>), permitting all non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.</license-p>
</license>
</permissions>
<abstract xml:lang="en">
<title>Abstract</title>
<p>The purpose of this paper is to explore context adaptation of change processes in the setting of public administration. This is done by adopting a contingency approach. Thus, the research question guiding this study is: <italic>How is context adaptation enacted in change processes and what are the behavioural implications?</italic> Drawing on empirical findings from the Swedish Transport Administration, the study illustrates the enactment of context adaptation and its behavioural implications through the phases of change. The analysis identifies key contextual factors and contingency variables, demonstrating that context adaptation is enacted by managers and employees. Notably, certain context adaptation led to contradictory behavioural patterns. This study hence contributes to public administration literature by exploring the enactment of context adaption in change processes which represents an understudied phenomenon in this field.</p>
</abstract>
<kwd-group xml:lang="en">
<title>Keywords</title>
<kwd>change context</kwd>
<kwd>context adaptation</kwd>
<kwd>public administration</kwd>
<kwd>change management</kwd>
<kwd>contingency approach</kwd>
</kwd-group>
</article-meta>
</front>
<body>
<boxed-text>
<sec><title>Practical Relevance</title>
<list list-type="bullet">
<list-item><p>Context adaptation is enacted continuously throughout the change process by managers and employees.</p></list-item>
<list-item><p>Managers and employees acknowledge organizational structures as strong and not adaptable.</p></list-item>
<list-item><p>Since higher-level roles create conditions for lower-level roles, the management needs to be aware of their crucial role in creating conditions for context adaptation for employees.</p></list-item>
<list-item><p>Behavioural implications include contradictory behavioural patterns.</p></list-item>
</list>
</sec>
</boxed-text>
<sec id="sec1"><title>Introduction</title>
<p>Organizational change refers to substantial shifts in direction, structure, or processes that affect significant parts of an organization. These shifts may involve the implementation of new technologies, transformation of organizational culture, or efforts to ensure compliance with specified work procedures (<xref ref-type="bibr" rid="R24">Edmondson, 2018</xref>). Change is an inevitable aspect of organizational life, requiring a transition from the current state to a desired future state in order to align strategic objectives with operational realities (<xref ref-type="bibr" rid="R24">Edmondson, 2018</xref>; <xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>). Such transitions - described as movements &#x201C;from here to there&#x201D; (<xref ref-type="bibr" rid="R64">Supriharyanti and Sukoco, 2022</xref>, p. 46) - occur within specific organizational contexts (<xref ref-type="bibr" rid="R33">Hughes, 2011</xref>). Understanding and adapting to these contexts is critical for successful change implementation. Contextual adaptation enhances the likelihood of achieving desired outcomes (<xref ref-type="bibr" rid="R3">Al-Haddad and Kotnour, 2015</xref>), particularly in environments characterized by rapid change and complexity, such as Scandinavian public organizations (<xref ref-type="bibr" rid="R13">Brorstr&#x00F6;m <italic>et al.</italic>, 2023</xref>). Despite the extensive number of change management frameworks, scholars argue that many lack sensitivity to context-specific challenges within public administration (<xref ref-type="bibr" rid="R37">Kuipers <italic>et al.</italic>, 2014</xref>). Hence, there is a need to examine context adaptation in the enactment of public sector change processes (<xref ref-type="bibr" rid="R17">Cloutier <italic>et al.</italic>, 2016</xref>).</p>
<p>Addressing these context-specific challenges requires a deliberate focus on adapting change processes to the organizational context. This study focuses on change processes in a public organization, specifically dealing with traffic management. This operation involves monitoring infrastructure, managing traffic flows, and disseminating information to ensure safe and efficient transportation. As a vital component of Sweden&#x2019;s transportation system, traffic management plays a key societal role (<xref ref-type="bibr" rid="R65">Swedish Civil Contingencies Agency, 2024</xref>). Within this sector, <xref ref-type="bibr" rid="R42">Lofquist and Isaksen (2019)</xref> emphasize that change initiatives must be tailored to the unique operational context, as standardized approaches are often insufficient. Practitioners in traffic management have identified several recurring challenges in change implementation: (1) insufficient understanding of contextual and human factors (<xref ref-type="bibr" rid="R43">Long et al., 2012</xref>), (2) limited stakeholder involvement (<xref ref-type="bibr" rid="R68">Touko Tcheumadjeu et al., 2022</xref>), and (3) uncertainty regarding the impact of new systems on traffic operations (<xref ref-type="bibr" rid="R41">Liu et al., 2022</xref>). These issues underscore the need for deeper insights into how change processes can be effectively adapted to specific contexts within public administration, and traffic management in particular.</p>
<p>Therefore, this study adopts a contingency approach to explore context adaptation in public administration change processes, specifically related to traffic management at the Swedish transport administration. The contingency lens is applied as theoretical lens to enable an analysis of context adaptation in terms of processes and structures. According to this lens, processes and structures of an organisation must be adapted to the context for the organization to be successful (<xref ref-type="bibr" rid="R21">Donaldson, 2001</xref>). This context-adaptation process is built on the assumption that humans are boundedly rational, and consequently they operate within cognitive and informational limits. This means that humans are simplifying change processes and seeking satisfactory solutions, rather than finding the optimal one (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). With attention to context adaptation and its behavioural implications, this study is guided by the following research question: <italic>How is context adaptation enacted in change processes and what are the behavioural implications?</italic> This abductive study therefore advances knowledge of context adaptation in change processes in a public administration setting. By applying the contingency lens, this study scrutinizes the human dimensions in the enactment of context adaptation through the different phases of change.</p>
</sec>
<sec id="sec2"><title>Theoretical Background</title>
<sec id="sec2_1"><title>Organizational change approaches</title>
<p>Organizational change encompasses two distinct dimensions: naturally occurring change and managerial efforts to produce change (<xref ref-type="bibr" rid="R24">Edmondson, 2018</xref>). This paper focuses on the latter, the management of change. Research in public administration and traffic management applies various theoretical approaches to organizational change, notably planned and emergent (<xref ref-type="bibr" rid="R7">Bamford and Forrester, 2003</xref>; <xref ref-type="bibr" rid="R9">Biedenbach and S&#x00F6;derholm, 2008</xref>; <xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>). The planned approach is common in traffic management, particularly in implementing new technologies through a top-down strategy (<xref ref-type="bibr" rid="R42">Lofquist and Isaksen, 2019</xref>; <xref ref-type="bibr" rid="R43">Long <italic>et al.</italic>, 2012</xref>; <xref ref-type="bibr" rid="R63">Stathis <italic>et al.</italic>, 2022</xref>). <xref ref-type="bibr" rid="R39">Lewin&#x2019;s (1947)</xref> model&#x2014;unfreeze, move, refreeze&#x2014;illustrates planned change, assuming stable conditions allowing movement between equilibrium states. Critics argue that this approach overly depends on top management dictating timelines, goals, and methods (<xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>). The emergent approach, conversely, is addressing a bottom-up processes where technology development emphasizes human-technology interactions (<xref ref-type="bibr" rid="R49">Nylin <italic>et al.</italic>, 2022</xref>; <xref ref-type="bibr" rid="R51">Patriarca <italic>et al.</italic>, 2016</xref>; <xref ref-type="bibr" rid="R56">Reyes-Mu&#x00F1;oz <italic>et al.</italic>, 2023</xref>). Here, change is viewed as a continuous, adaptive process characterized by experimentation and rapid responsiveness (<xref ref-type="bibr" rid="R7">Bamford and Forrester, 2003</xref>; <xref ref-type="bibr" rid="R9">Biedenbach and S&#x00F6;derholm, 2008</xref>; <xref ref-type="bibr" rid="R14">Burnes, 1996</xref>, <xref ref-type="bibr" rid="R15">2004</xref>; <xref ref-type="bibr" rid="R19">Dawson, 1996</xref>; <xref ref-type="bibr" rid="R25">Edwards <italic>et al.</italic>, 2020</xref>). Higher-level management acts as a facilitator rather than a controller of change (<xref ref-type="bibr" rid="R7">Bamford and Forrester, 2003</xref>).</p>
<p>In the public sector, one important driver for organizational change is digitalization which include leveraging new Information and Communications Technologies (ICT) to transform strategies and operations. These initiatives remain challenging despite extensive research and practice (<xref ref-type="bibr" rid="R40">Li, 2020</xref>; <xref ref-type="bibr" rid="R47">Molin and Norrman Brandt, 2023</xref>; <xref ref-type="bibr" rid="R48">Norrman and N&#x00E4;slund, 2025</xref>). Public organizations have increasingly adopted the use of portfolio, programme, and project management logics to achieve organizational change (<xref ref-type="bibr" rid="R10">Bonomi Savignon and Costumato, 2024</xref>). Challenges mentioned for succeeding with these changes include, for example: lack of strategic communications, failure to define a clear roadmap, and to plan and execute the right steps (<xref ref-type="bibr" rid="R40">Li, 2020</xref>). Although context is briefly mentioned in these studies, surprisingly little research focus specifically on context adaptation.</p>
</sec>
<sec id="sec2_2"><title>Context</title>
<p>An organization&#x2019;s context encompasses its internal and external environments (<xref ref-type="bibr" rid="R37">Kuipers <italic>et al.</italic>, 2014</xref>), see <xref ref-type="fig" rid="F1">Figure 1</xref>. Internal context refers to organizational and individual factors (<xref ref-type="bibr" rid="R2">Alfes <italic>et al.</italic>, 2019</xref>; <xref ref-type="bibr" rid="R5">Anderson and Young, 1999</xref>). Organizational factors include the availability of necessary resources, communication, organizational culture, involvement, leadership, plan for implementation and monitoring of change, organizational structures, team relationships, technology, motive and extent of the change, time, prevalence of change and readiness for change (<xref ref-type="bibr" rid="R5">Anderson and Young, 1999</xref>; <xref ref-type="bibr" rid="R6">Balthu and Clegg, 2021</xref>; <xref ref-type="bibr" rid="R11">Brandes and Lai, 2022</xref>; <xref ref-type="bibr" rid="R12">Brazzale <italic>et al.</italic>, 2021</xref>; <xref ref-type="bibr" rid="R19">Dawson, 1996</xref>; <xref ref-type="bibr" rid="R50">&#x00D8;vretveit <italic>et al.</italic>, 2012</xref>). Individual factors encompass motivation, knowledge, experience, and learning, past experience of change, propensity to change, resistance to change and values and needs of individuals are mentioned as individual contextual factors (<xref ref-type="bibr" rid="R5">Anderson and Young, 1999</xref>; <xref ref-type="bibr" rid="R11">Brandes and Lai, 2022</xref>; <xref ref-type="bibr" rid="R16">Chaudhry, 2020</xref>). External context, on the other hand, covers technological factors, legislative factors, social factors, political factors, economic factors, market factors and competitive factors (<xref ref-type="bibr" rid="R1">Abeygunasekera <italic>et al.</italic>, 2022</xref>; <xref ref-type="bibr" rid="R19">Dawson, 1996</xref>; <xref ref-type="bibr" rid="R20">Dmitrijeva <italic>et al.</italic>, 2020</xref>; <xref ref-type="bibr" rid="R62">Silver <italic>et al.</italic>, 2016</xref>).</p>
<fig id="F1"><label>Figure 1.</label><caption><p>Illustration of contextual factors</p></caption>
<graphic xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="c4-fig1.jpg"><alt-text>none</alt-text></graphic></fig>
<p>Understanding context involves analysing not only processes and structures but also incorporating the human dimensions which shape organizational change (<xref ref-type="bibr" rid="R54">Pettigrew et al., 2001</xref>). Organizations are composed of several contexts that are interpreted by humans (<xref ref-type="bibr" rid="R27">Frishammar, 2006</xref>; <xref ref-type="bibr" rid="R36">Khaw <italic>et al.</italic>, 2023</xref>; <xref ref-type="bibr" rid="R54">Pettigrew <italic>et al.</italic>, 2001</xref>; <xref ref-type="bibr" rid="R70">Tsoukas and Chia, 2002</xref>). Therefore, when studying the enactment of context adaptation, it is important to take into account both processes, structures and the human dimensions.</p>
</sec>
<sec id="sec2_3"><title>Contingency approach</title>
<p>The contingency approach is applied as theoretical lens to enable an analysis of context adaptation in terms of processes, structures and human dimensions. This approach focuses specifically on variables that affect organizational performance (<xref ref-type="bibr" rid="R21">Donaldson, 2001</xref>; <xref ref-type="bibr" rid="R28">Galbraith and Nathanson, 1978</xref>). One key assumptions within the contingency approach is that organizations function as open rational systems, meaning purposefully designed and managed to achieve specific goals (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). This perspective implies that organizational processes and structures are not fixed but should be adapted to fit environmental conditions and strategic objectives. This means that there is no single best way to organize; efficiency depends on alignment with internal and external contingencies (<xref ref-type="bibr" rid="R21">Donaldson, 2001</xref>; <xref ref-type="bibr" rid="R66">Thompson, 1967</xref>; <xref ref-type="bibr" rid="R73">Woodward, 1966</xref>). If contingencies shift and structures remain static, performance declines, requiring adaptive change to realign structures and processes (<xref ref-type="bibr" rid="R21">Donaldson, 2001</xref>). Thus, organizations must continually seek the &#x201C;one best way for each&#x201D; (<xref ref-type="bibr" rid="R14">Burnes, 1996</xref>, p. 15) organization. This study differentiates between contingency variables, which are immutable and require adaptation, and contextual factors, which organizations can influence as part of change efforts. Another key assumption is that humans are boundedly rational, and operate within cognitive and informational limits (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). This means, that while they strive to make rational choices, their capacity to gather, interpret, and process information is limited. Instead of identifying optimal solutions, they simplify decision-making by setting achievable targets and selecting satisfactory options. Therefore, when studying the enactment of context adaptation, it is important to include the behavioural implications, including managers&#x2019; and employees&#x2019; perceptions and accordingly how they shape the change process.</p>
</sec>
<sec id="sec2_4"><title>Context adaptation within organizational change</title>
<p>Within the field of organizational change, various models have been developed to facilitate context adaptation. First, <xref ref-type="bibr" rid="R44">Luthans and Stewart&#x2019;s (1977)</xref> model of planned change involves four steps: (1) contingency audit, (2) strategy development, (3) implementation, and (4) result evaluation. Evaluations feed into a database to inform future strategies. Second, <xref ref-type="bibr" rid="R23">Dunphy and Stace&#x2019;s (1988)</xref> situational model factors in both type of change and leadership approach, recommending strategy variation for an &#x201C;optimal fit&#x201D; with a dynamic environment (<xref ref-type="bibr" rid="R22">Dunphy and Stace, 1993</xref>, p. 905). Third, <xref ref-type="bibr" rid="R30">Hailey and Balogun&#x2019;s (2002)</xref> Change Kaleidoscope broadens earlier models by integrating a wider set of contextual features and offering repeated evaluations during the change process (<xref ref-type="bibr" rid="R6">Balthu and Clegg, 2021</xref>; <xref ref-type="bibr" rid="R30">Hailey and Balogun, 2002</xref>). Unlike earlier models, which assume stable contexts, the Change Kaleidoscope recognizes that both context and change strategies must evolve during implementation.</p>
<p>Despite such context adaptation frameworks in a public sector setting, it remains unclear how the human dimension, together with processes and structures, shape the change process. Existing public administration literature emphasizes that managers can have a significant effect on how employees perceive change. <xref ref-type="bibr" rid="R60">Seijts and Roberts (2011)</xref> argue that the management-level can shape both the context and the process of organizational change by establishing structures to enhance employees&#x2019; opportunities to actively participate in the change process. <xref ref-type="bibr" rid="R36">Khaw <italic>et al.</italic> (2023)</xref>, highlight that thoughtful and inclusive communication strategies can foster positive engagement, whereas a poor framing of the change process may trigger adverse reactions. <xref ref-type="bibr" rid="R31">Hameed <italic>et al.</italic> (2019)</xref>, underscore the importance of a clear purpose, noting that managers must address the critical question: &#x2018;What do I gain from this change?&#x2019; Furthermore, <xref ref-type="bibr" rid="R60">Seijts and Roberts (2011)</xref> demonstrate that managers play a crucial role in fostering desired behavioural change by providing employees with the necessary support and resources. However, limited attention has been given to the enactment of context adaptation and its human elements in terms of bounded rationality when managers operate within cognitive and informational limits (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>).</p>
<p>Conversely, for employees, existing literature highlights both positive and negative behavioural implications when context adaptation is enacted, particularly in relation to factors such as communication, involvement, planning, and managerial support. In terms of communication, employees report negative perceptions when they feel insufficiently informed in a inaccessible manner (<xref ref-type="bibr" rid="R34">Jones <italic>et al.</italic>, 2008</xref>), whereas timely and transparent communication about the change is perceived positively (<xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>). When it comes to involvement, employees who are encouraged to participate in the change process, and whose input is valued and utilized, are more likely to remain positive about the change (<xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>). When it comes to planning, employees may experience changing roles, heavier workload, and intensified training as challenging (<xref ref-type="bibr" rid="R34">Jones <italic>et al.</italic>, 2008</xref>). Finally, employees who are supported by the management feel empowered and are more open to organizational changes (<xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>).</p>
</sec>
<sec id="sec2_5"><title>Orienting frame of reference</title>
<p>For this study, the orienting frame of reference synthesizes the theoretical background and form the basis for exploring how context adaptation is enacted in change processes and what the behavioural implications are, see <xref ref-type="fig" rid="F2">Figure 2</xref>. Based on the theoretical lens of contingency, the orienting frame of reference highlights the organizational context consisting of different internal and external contextual factors (including contingency variables) (<xref ref-type="bibr" rid="R2">Alfes <italic>et al.</italic>, 2019</xref>; <xref ref-type="bibr" rid="R5">Anderson and Young, 1999</xref>; <xref ref-type="bibr" rid="R37">Kuipers <italic>et al.</italic>, 2014</xref>; <xref ref-type="bibr" rid="R62">Silver <italic>et al.</italic>, 2016</xref>). The contextual factors can be assessed with the aim to find the fit between context and change strategy (<xref ref-type="bibr" rid="R23">Dunphy and Stace, 1988</xref>; <xref ref-type="bibr" rid="R30">Hailey and Balogun, 2002</xref>; <xref ref-type="bibr" rid="R44">Luthans and Stewart, 1977</xref>). However, the contingency variables cannot be changed but the organization can adapt to them while the contextual factors can be influenced. Changes based on planned change is related to the top-down perspective while emergent change relates to the bottom-up perspective (<xref ref-type="bibr" rid="R9">Biedenbach and S&#x00F6;derholm, 2008</xref>; <xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>). During the change process re-evaluations could be performed to adapt change strategy to the changing context (<xref ref-type="bibr" rid="R6">Balthu and Clegg, 2021</xref>). Finally, an evaluation of the final result is made after the implementation (<xref ref-type="bibr" rid="R30">Hailey and Balogun, 2002</xref>; <xref ref-type="bibr" rid="R44">Luthans and Stewart, 1977</xref>). Adaptation is initially assumed to take place during the development of the change strategy and then during the change process through the implementation of the change strategy. Assessment of whether the adaptation is sufficient is assumed to take place during initial assessment of the context (including previous evaluations), implementation of change strategy (the change process) and evaluation of results. Aligned with the contingency approach, the orienting frame of reference (see <xref ref-type="fig" rid="F2">Figure 2</xref>) is based on the assumption that humans are boundedly rational and operate within cognitive and informational limits (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). This implies that humans are simplifying change processes and seeking satisfactory solutions, rather than finding the optimal one (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). As a result, the behavioural implications address both top-level managers&#x2019; and employees&#x2019; perceptions of context adaptation when the change process is enacted.</p>
<fig id="F2"><label>Figure 2.</label><caption><p>Orienting frame of reference</p></caption>
<graphic xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="c4-fig2.jpg"><alt-text>none</alt-text></graphic></fig>
</sec>
</sec>
<sec id="sec3"><title>Method</title>
<sec id="sec3_1"><title>The empirical context</title>
<p>The context for this study is The Swedish Transport Administration (STA). This public authority is publicly funded through taxation, and political authority plays an important role through annual appropriations letters, government mandates, and resource allocation. Their vision &#x201C;Everybody arrives smoothly, the green and safe way&#x201D;, combined with reduced financial budgets, illustrate the contemporary complex challenges STA as a public authority is facing. STA is responsible for the long-term planning of the transport system for road, rail, shipping and air. STA is also responsible for building, operating and maintaining state roads and railways, and ensuring that this infrastructure is used efficiently. Organizationally, the authority is divided into several business areas and central functions and has approximately 9000 employees (<xref ref-type="bibr" rid="R69">Trafikverket, 2025</xref>).</p>
<p>The specific empirical context for this study is Business area Traffic management. The Business area is responsible for providing traffic management and traffic information to the Swedish road and rail network. Operations are conducted at traffic control centres spread across the country were operative employees with different roles work shifts to maintain delivery 24/7, around the clock. The Business area Traffic management has approximately 2000 employees. Organizationally, the nationwide department for business development and asset management is responsible for running projects, while it is employees at the traffic control centres in the operational activities that are the recipients of the changes. In specific, the change process that has been explored in this study entails development of working routines and IT system that were implemented at traffic control centres. The purpose of the developed working routines and IT system was to improve the quality of the traffic management delivery (meaning satisfied travellers, road users and businesses that use roads and railways) with existing personnel resources. Operative employees were the staff group that was primarily affected by this change and prior to the change implementation, training was carried out for the operational employees.</p>
<p>A top-down, planned approach to organizational change is adopted at STA. Projects apply the project model, XLPM (<xref ref-type="bibr" rid="R61">Semcon, 2024</xref>), that describes project activities, decision points, and, responsibilities to ensure that set goals are achieved. Regarding change management, a framework for change management is used that is based on a change management model developed for public administrations (<xref ref-type="bibr" rid="R26">Ekonomistyrningsverket, 2007</xref>). The framework include phases corresponding to the three phases described by <xref ref-type="bibr" rid="R39">Lewin (1947)</xref>: prepare for the change, implement the change and reinforce the change (<xref ref-type="bibr" rid="R26">Ekonomistyrningsverket, 2007</xref>). However, given the challenges of implementing changes in operational activities with shift work, the organization has begun to consider whether the changes should be more adapted to the context.</p>
<p>This context offers a compelling case to study due to the pronounced challenges of adapting change processes to the context of 24/7 operational activities with shift work, together with the enactment of change processes involving both managers and employees.</p>
</sec>
<sec id="sec3_2"><title>Designing and conducting the study</title>
<p>This study adopts an abductive qualitative approach to increase understanding of how context adaptation is enacted in change processes, including the behavioural implications, in the field of public administration in the empirical context of traffic management. The qualitative approach is motivated by the fact that qualitative research is contextually anchored and allows the researcher to become an interpreter of the people included in the study (<xref ref-type="bibr" rid="R53">Pettigrew, 2013</xref>). This is in line with that change within public administration needs to be understood as a contextualized phenomenon using a qualitative approach (<xref ref-type="bibr" rid="R4">Alvehus and Loodin, 2023</xref>). The abductive approach include an iterative process of understanding the &#x201C;parts&#x201D; in relation to the &#x201C;whole&#x201D; in order to capture deeper meanings (<xref ref-type="bibr" rid="R55">Prasad, 2018</xref>). In the analysis this is manifested by going back and forth between the empirical data and theory to refine interpretations and engage with theory continuously (<xref ref-type="bibr" rid="R8">Bell <italic>et al.</italic>, 2019</xref>; <xref ref-type="bibr" rid="R35">Ketokivi and Choi, 2014</xref>). We abductively involved theory on organizational change, context, contingency approach, and context adaptation to analyse and understand the findings an enable theory elaboration (<xref ref-type="bibr" rid="R35">Ketokivi and Choi, 2014</xref>).</p>
<p>The empirical data consists of 21 face-to-face semi-structured interviews. Informants were purposefully selected to represent different perspectives of actor groups in the organization in order to enable comparisons of perceptions across ongoing processes (<xref ref-type="bibr" rid="R8">Bell et al., 2019</xref>). The top-level management perspective is represented by six top-level managers in the Business area. The employee perspective is represented by six employees who lead projects, six operational employees at traffic control centres and three operational employees at traffic control centres who get an increased opportunity to participate in changes (this role can be temporary as project member or more permanently as instructor or educator), see <xref ref-type="table" rid="T1">Table 1</xref>. Operational employees&#x2019; participation in interviews was requested and approved through their immediate manager meaning that operational employees were provided based on availability. When the informant was invited to the interview, the subject of the interview was introduced, and it was described what the research would be used for. The interviews were conducted during the period August 2022 to August 2023.</p>
<table-wrap id="T1"><label>Table 1.</label><caption><p>Informants</p></caption>
<table>
<thead>
<tr>
<th align="left">Perspective</th>
<th align="left">Actor group</th>
<th align="left">Nr</th>
<th align="left">Description of the informants&#x2019; role</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="6"><bold>Management</bold></td>
<td align="left" rowspan="6">Top-level managers within the business area</td>
<td align="left">TM1</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="center">TM2</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="center">TM3</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="center">TM4</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="center">TM5</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="center">TM6</td>
<td align="left">Head of department</td>
</tr>
<tr>
<td align="left" rowspan="15"><bold>Employee</bold></td>
<td align="left" rowspan="6">Employees who lead projects, for example business developers and project managers</td>
<td align="left">PL1</td>
<td align="left">Business developer/Asset manager</td>
</tr>
<tr>
<td align="center">PL2</td>
<td align="left">Business developer/Project manager</td>
</tr>
<tr>
<td align="center">PL3</td>
<td align="left">Project manager</td>
</tr>
<tr>
<td align="center">PL4</td>
<td align="left">Project manager</td>
</tr>
<tr>
<td align="center">PL5</td>
<td align="left">Project manager</td>
</tr>
<tr>
<td align="center">PL6</td>
<td align="left">Project manager</td>
</tr>
<tr>
<td align="left" rowspan="3">Operational employees at traffic control centres who have increased opportunity to participate in changes (also called Operational employees +)</td>
<td align="left">OE+1</td>
<td align="left">Operational employee, Project member</td>
</tr>
<tr>
<td align="center">OE+2</td>
<td align="left">Operational employee, Instructor</td>
</tr>
<tr>
<td align="center">OE+3</td>
<td align="left">Operational employee, Educator</td>
</tr>
<tr>
<td align="left" rowspan="6">Operational employees at traffic control centres who are affected by the changes control centres who are affected by the changes</td>
<td align="left">OE1</td>
<td align="left">Operational employee</td>
</tr>
<tr>
<td align="center">OE2</td>
<td align="left">Operational employee</td>
</tr>
<tr>
<td align="center">OE3</td>
<td align="left">Operational employee</td>
</tr>
<tr>
<td align="center">OE4</td>
<td align="left">Operational employee</td>
</tr>
<tr>
<td align="center">OE5</td>
<td align="left">Operational employee</td>
</tr>
<tr>
<td align="center">OE6</td>
<td align="left">Operational employee</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>To collect information from informants but still be able to be flexible to ask follow-up questions, semi-structured interviews were chosen (<xref ref-type="bibr" rid="R58">Ruslin et al., 2022</xref>), see Appendix 1. The research question and the orienting frame of reference formed the basis when the interview guide was developed. The interview guide contained a sequence of questions and, if necessary, follow-up questions were asked during the interviews (<xref ref-type="bibr" rid="R38">Kvale, 2022</xref>). Open questions were asked and in each interview the informant had the opportunity to describe their specific context, their role in changes and define change management. As the last question before the interview ended, the interviewer asked if the informant had something further to add that was not recovered during the interview. A pilot study involving four interviews was conducted to test the interview guide. The interviews lasted approximately 45 min and were conducted via Skype. The interviews were recorded and later transcribed in full.</p>
</sec>
<sec id="sec3_3"><title>Analysing the empirical data</title>
<p>The empirical data was analysed in several steps following the procedures of the hermeneutic circle (<xref ref-type="bibr" rid="R18">Darby et al., 2019</xref>). The hermeneutic circle represents an iterative process of understanding the &#x201C;parts&#x201D; in relation to the &#x201C;whole&#x201D; in order to capture deeper meanings (<xref ref-type="bibr" rid="R55">Prasad, 2018</xref>). The contingency approach encompasses a variety of units of analysis (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). In this study, the chosen unit of analysis is top-level managers and employees, and their perceived challenges of context adaptation when the change process is enacted. In the first step, intratextual analysis was used to interpret each informant. Directly after each interview, short summaries were written to capture initial interpretations. Each informant&#x2019;s experience was then summarized, including identified contextual/contingency aspects and activities of adaptation to the context of change. Secondly, intertextual analysis was carried out to find differences and similarities in the different informants&#x2019; perceptions of context adaptation. The analysis was conducted by using descriptive coding on the intratextual summaries with priori codes (contextual factors, contingency variables, current adaptations, challenges, phase of change) but also letting codes emerge from the data were used to categorize similar pieces of data (<xref ref-type="bibr" rid="R45">Miles et al., 2014</xref>). Thirdly, the codes were used to group data to find differences and similarities across informants, forming the basis for identifying overarching themes in the empirical material (<xref ref-type="bibr" rid="R46">Miles et al., 2020</xref>; <xref ref-type="bibr" rid="R59">Ryan and Bernard, 2003</xref>). The NVivo software was used for coding and identifying themes. Since all priori codes in regards of contextual factors were not identified by the informants they are not included in the analysis. However, we identified two contradictory behavioural patterns that is discussed in section 4.5. During the analysis of the empirical material, tables and figures were used to organize the data but also to display the data and visualize similarities and differences between the actors&#x2019; perceptions (<xref ref-type="bibr" rid="R46">Miles et al., 2020</xref>). Several quality-enhancing activities to ensure trustworthiness was conducted during the analysis of the empirical data. One such activity was a reference group (7 people at manager and employee level, 3-4 meetings per year) at the studied organization where key people were given the opportunity to discuss the preliminary results and provide feedback on interpretations.(<xref ref-type="bibr" rid="R29">Grant and Lincoln, 2021</xref>; <xref ref-type="bibr" rid="R52">Pettigrew, 1990</xref>; <xref ref-type="bibr" rid="R57">Rodham et al., 2015</xref>).</p>
</sec>
</sec>
<sec id="sec4"><title>Results</title>
<p>When studying enactment of context adaptation in the change processes, there were differences as to how the top-level managers and employees experienced context adaptation. The differences were demonstrated in terms of the importance of contextual factors and the behavioural implications. In this section, these differences will be explored in detail when the results are presented. Building on the orienting frame of reference, context adaptation is assumed to take place during development and implementation of change strategy in the phases of the change process. In the following sections, the presentation will follow the phases that the Swedish Transport Administration apply in change processes, see <xref ref-type="fig" rid="F3">Figure 3</xref>. The phases covered are development of change strategy, preparation for the change, implementation of the change and reinforcement of the change (<xref ref-type="bibr" rid="R26">Ekonomistyrningsverket, 2007</xref>).</p>
<fig id="F3"><label>Figure 3.</label><caption><p>Outline for presenting results</p></caption>
<graphic xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="c4-fig3.jpg"><alt-text>none</alt-text></graphic></fig>
<p>The presentation of the analysis of the empirical data is summarized in tables, see <xref ref-type="table" rid="T2">Table 2</xref> for an overview. The presentation will be based on the contextual factors (influenceable) and contingency variables (immutable but can be adapted to) that top-level managers and employees have identified. These will be listed in tables along with the behavioural implications, the perceived current context adaptations and challenges. As illustrated in the table, a contextual factor can be linked to several contingency variables.</p>
<table-wrap id="T2"><label>Table 2.</label><caption><p>Structure of tables to summarize the analysis of empirical data</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Contextual factor</th>
<th align="left">Contingency variable</th>
<th align="left">Current adaptation</th>
<th align="left">Challenges</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="2"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Contextual factor A</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Contingency variable A1</p></list-item><list-item><p>Contingency variable A2</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Contextual factor B</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Contingency variable B1</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><bold>Employees who lead projects</bold></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><bold>Operational employees +</bold></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><bold>Operational employees</bold></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
</tbody>
</table>
</table-wrap>
<sec id="sec4_1"><title>Development of change strategy</title>
<p>In the phase of development of change strategy, it is apparent that in STA this is an activity mostly involving a top-down perspective, meaning only top-level managers are involved. The foundation of this phase is guided by top-down methods to drive change within the organization. Both the STA&#x00B4;s project model and their change management framework are based on a planned, top-down, approach to change. Top-level managers are involved in development of change strategies mainly in the role of sponsor or as a participant in the steering group for projects. Toplevel managers contribute to the decision of change strategy with perspectives mainly related to planning the implementation, for example: managing dependencies between projects to ensure that implementations do not collide, that there are plans for information and training those affected by the change, that the plan for implementation include pilots to test changed working methods and systems on a smaller scale before full-scale implementation and to balance the need for change with availability of necessary resources. Although the organization is guided by this top-down perspective, it is not always clear to the top-level managers themselves what their role includes in change processes. This is illustrated by top-level managers below:</p>
<disp-quote><p>We need to get commitment from the organization, a cross-functional steering group could be needed. It needs to be clarified what it means to be a sponsor and participate in a steering group. You should not be a passive representative, but you should actively ensure that the needs of your business area or department are taken care of. (TM6)</p></disp-quote>
<disp-quote><p>It is not appropriate to implement a change with a new IT system at the same time as new infrastructure is to be put into use. In the middle of the holiday period, it is also not appropriate to introduce changes. You need to ensure that the employees are trained before implementing the change. You can choose to implement changes in stages, as pilots. (TM1)</p></disp-quote>
<disp-quote><p>We have staffing challenges. This means that we are quite stressed in the situation and people may ask for a change and want a change, but then we don&#x2019;t have the resources to drive the change. Which means that there will be some kind of catch 22. We want a change, but we don&#x2019;t have time for the change because we don&#x2019;t have the resources and capacity to do it. (TM3)</p></disp-quote>
<p>This shows that top-level managers identify that the contextual factor <italic>organizational structures</italic> influence the development of change strategy, see <xref ref-type="table" rid="T3">Table 3</xref>. The overall structures in the project model and framework for change management are not perceived to be adaptable (and therefore contingency variables) to the specific change process (meaning that the structures offered by the models and frameworks are mandatory), nor is the fact that the operational activities are conducted through shift work. To have access to the necessary resources in the long term, initiatives are underway in the organization to create stable staffing. However, for the specific change this is a factor that cannot be influenced and is thus a contingency variable. The behavioural implications highlight current context adaptation and challenges. What is adapted is that steering groups can be staffed with relevant participants, that change processes are adapted to the operational activities by planning phased implementations, scheduling between projects and to balance the need for change with availability of necessary resources, operational staff. Remaining challenges that top-level managers perceive are clarity regarding roles and responsibilities in steering groups and manage shortage of operational staff.</p>
<table-wrap id="T3"><label>Table 3.</label><caption><p>Development of change strategy</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Contextual factor</th>
<th align="left">Contingency variable</th>
<th align="left">Current adaptation</th>
<th align="left">Challenges</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="3"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Organizational structures</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Structures in project model and change management framework</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Steering groups with relevant participants</p></list-item><list-item><p>Phased implementations</p></list-item><list-item><p>Scheduling between projects</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Roles and responsibilities in steering groups</p></list-item>
</list></td>
</tr>
<tr>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Operational activities with shift work</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Availability of necessary resources, operational staff</p></list-item>
</list></td>
</tr>
<tr>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Availability of necessary resources, operational staff</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Balance need for change with availability of necessary resources, operational staff</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Balance need for change with availability of necessary resources, operational staff</p></list-item>
</list></td>
</tr>
</tbody>
</table>
</table-wrap>
</sec>
<sec id="sec4_2"><title>Prepare</title>
<p>During the first phase of the change process, prepare, focus is on communication and dealing with potential concerns about the change to create change readiness. Top-level managers acknowledge that it is important to be aware of the potential concerns of operational employees at this stage. Furthermore, it is perceived as a challenge that it is not possible to gather the entire staff at the same time to inform about changes, due to operational activities that take place around the clock. Although there is a focus on communication, the top managers do not seem to have the solution for how it can be adapted based on the operational activities as they perceive communication as challenging. This is illustrated by a top-level manager below:</p>
<disp-quote><p>It is important to capture the operational employees&#x2019; feeling of insecurity, which can consist of many different factors. It is much easier to gather the entire staff and say that now we are going to implement a change, you will get training, you will get to test new working methods and systems. But this is very difficult in an operational business that is ongoing around the clock. (TM3)</p></disp-quote>
<p>Employees who lead projects identify that it is important to communicate about the upcoming change to create a shared vision of what is to be achieved and thereby set expectations among the operative employees. Furthermore, planning of the implementation starts by clarifying who is responsible for what and which activities need to be done. These plans become increasingly detailed over time. The employees who lead projects also acknowledge the operational employees at traffic control centres as recipients of the change, which has its basis in the distribution of responsibilities in the project model and change management framework used for change initiatives. Employees who lead projects have responsibility up to a certain stage and then hands over to recipients which are traffic control centres and asset management. Even if employees who lead projects focus on communication, the purpose of communication seems to be about clarifying boundaries and expectations rather than creating involvement. This is illustrated by three employees who lead projects below:</p>
<disp-quote><p>I think that with our communication being so extensive, we should have some help to reach out. I miss that, some type of platform or system to support collaboration and involvement. (PL2)</p></disp-quote>
<disp-quote><p>I think it is my position to communicate on an overall level in this phase. It&#x2019;s about managing expectations and keeping the communication going. (PL3)</p></disp-quote>
<disp-quote><p>I think that the change starts the same day as the project starts. You start talking about what is going to happen and you get a common picture through dialogue. Then you make plans that become more and more detailed over time. In the project, we used RACI (responsibility assignment matrix) to clarify to the receiving organization what the expectations are. (PL5)</p></disp-quote>
<p>Operational employees with increased opportunity to participate in changes (OE+) observe that changes are decided and driven top-down, which can be perceived as the need for change not stemming from the operational activities. During the prepare phase, it is perceived as important by OE+ that they are given the opportunity and conditions to train their colleagues before the change implementation. These employees participate in risk analyses carried out by the employees who lead projects. Although communication and involvement are important in this phase, employees with increased opportunities to participate in changes perceive that their involvement is not sufficient and that they often need to request additional information. This is illustrated by three OE+ below:</p>
<disp-quote><p>I perceive my role is rather insignificant in this phase. Changes are decided higher up in the organization before you even know if resources are available. A risk analysis is carried out. (OE+1)</p></disp-quote>
<disp-quote><p>I perceive that we are missed in this phase. We should be more involved. We should be able to give opinions and be able to participate and influence. (OE+2)</p></disp-quote>
<disp-quote><p>We sometimes receive information beforehand, meaning me and my training colleagues. Then it becomes our role to teach what we have been briefed on or just read about. I perceive that I need to seek additional information because my colleagues come and ask me about how the change will affect them. (OE+3)</p></disp-quote>
<p>Operational employees identify that communication and participation are important in this phase, however, communication is often in the form of information and the lack of availability of personnel resources makes it difficult for operational employees to be involved. Although communication is important, operative employees feel that they only receive information at this stage. This is illustrated by an operational employee below:</p>
<disp-quote><p>For me, it is important that we (operational employees) receive information that something is to be changed, or that something is to be introduced. I think we need suitable information. We often receive the information by email. (OE3)</p></disp-quote>
<p><xref ref-type="table" rid="T4">Table 4</xref> summarizes the prepare phase. Top-level managers identify <italic>organizational structures</italic> and <italic>values and needs of individuals</italic> as contextual factors that influence at this phase. The mission of the organization is providing traffic management, meaning the operational activities with shift work is a structure that top-level managers cannot change hence it is a contingency variable. The current adaptation consists of communication and leadership to respond to concerns of operative employees. The perceived challenges consist of the issue that it is not possible to gather, and inform, all operative personnel at the same time. Employees who lead change identify the context factors <italic>communication</italic> and <italic>plan for implementation and monitoring of change</italic> to influence at this stage. Like top-level managers, employees who lead projects cannot alter the fact that the operation is an operational activity with shift work. At this stage, employees who lead projects perceive goals, and vision for the project and &#x201C;rules of the game&#x201D; regarding structures in the organization are not adaptable. What is adapted, however, is communication about goals and vision to manage expectations of the change, and that employees who lead projects also work actively to clarify roles and responsibilities in the change work. Perceived difficulties for employees who lead projects are finding ways to communicate and involve operational employees. Employees with OE+ identify that the contextual factors <italic>communication</italic> and <italic>involvement</italic> influence at this stage. When it comes to goals and vision for projects, they are perceived as fixed by these employees. OE+ are responsible for training their colleagues and at this stage they request information and training materials to understand the impact on roles, working methods and IT systems. Furthermore, these employees participate in risk analyses. The perceived challenges are about the opportunity to participate in change and contribute with own expertise. Operational employees identify that the contextual factors <italic>availability of necessary resources</italic> and <italic>communication</italic> influence at this stage. The availability of operational personnel is identified as a factor that cannot be influenced; hence it is contingency variable. Operational employees do not perceive that they can influence the communication about changes. Information is mostly received by e-mail. Like OE+ in changes, operational employees experience challenges related to the involvement.</p>
<table-wrap id="T4"><label>Table 4.</label><caption><p>Prepare</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Contextual factor</th>
<th align="left">Contingency variable</th>
<th align="left">Current adaptation</th>
<th align="left">Challenges</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="2"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Organizational structures</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Operational activities with shift work</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication and involvement as it is not possible to gather all employees</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Values and needs of individuals</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication and leadership to manage concerns of operational employees</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication and involvement as it is not possible to gather all employees</p></list-item>
</list></td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Employees who lead projects</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Operational activities with shift work</p></list-item><list-item><p>Goals and vision of the project</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication about vision and goal to handle expectations</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Find ways to communicate and involve operational employees</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation and monitoring of change</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Areas of responsibility of organizational parts and actors</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Clarifying responsibilities of organizational parts and actors</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Operational employee +</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Goals and vision for projects</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Request information and training materials to understand the impact of the change on role</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Anticipate the impact of changes on operational activities</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Participation in risk analyses</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Operational employees</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Availability of necessary resources</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Availability of necessary resources</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Communication</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Receive information mostly via email</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Be involved instead of getting information</p></list-item>
</list></td>
</tr>
</tbody>
</table>
</table-wrap>
</sec>
<sec id="sec4_3"><title>Implement</title>
<p>During the second phase, implement, tensions arise between maintaining operational delivery and having available personnel resources to implement changes. The top-level managers acknowledge that their role is to strengthen and support the change in this phase without being involved in the actual implementation. Perceived challenges are, among other things, that planning is required, and it takes a long time to train operative employees before the implementation because they work in shifts and the training needs to fit into their schedule while the operative work needs to continue undisturbed. This is illustrated by top-level managers below:</p>
<disp-quote><p>I contribute by strengthening, supporting, and clarifying the change, but not working with the implement-phase. I perceive this phase as more difficult as it depends a lot on the change management during implementation. (TM1)</p></disp-quote>
<disp-quote><p>We cannot shut down the business to implement an improvement or a change. The railway needs to operate all year round, around the clock. There are many aspects to consider in this phase, for example safety, employees and change management. I think you must be extra careful with these aspects when implementing changes in an operational activity. (TM6)</p></disp-quote>
<disp-quote><p>To train all operative employees it requires many days and weeks, as planning is required to fit it into their schedule. (TM3)</p></disp-quote>
<p>In this phase, employees who lead projects work further to clarify who is responsible for what, carry out tests of new IT systems and working routines, and then implementation of the change. There is an awareness that unexpected issues can arise and that the better prepared you are for this in the change project, the easier it is to handle these situations. In the implement-phase, when the project result is to be implemented, an interface appears where the employees who lead projects hands over to the first line managers of the traffic control centres to implement the change. This is illustrated by employees who lead projects below:</p>
<disp-quote><p>Somewhere along the way there is a shift in who is most likely to do things in this phase. It goes from being the project manager to being the first line manager. You make plans and agree on how it is to be done and are clear about the ownership. A deployment that is well planned and well tested beforehand should be undramatic. Of course, there are many things that happen and there can be many things that need to be addressed. Then things happen and then you must fend them. (PL5)</p></disp-quote>
<p>OE+ feels, despite their increased opportunity to participate, that this involvement is not sufficient to make use of their expertise on operational activities that is available. Although the change affects the operational employees, their operational knowledge is perceived not to be used to a sufficient extent in changes projects. This is illustrated by an OE+ below:</p>
<disp-quote><p>It is through me and my colleagues&#x2019; experience of what happens in the operational activities that we can contribute with feedback to projects. This is why it is so important to involve operational personnel in a change that will affect them because we have the experience from the operational activities. You don&#x2019;t know how a new process or program will work until you&#x2019;ve tried it operationally. You can carry out risk analyses and try to come up with possible scenarios, but you can assume that there will be scenarios happening that cannot be imagined. (OE+1)</p></disp-quote>
<p>Since operative employees in the initial phase mostly received information via e-mail, and were not further involved, they feel that the change now coming is fixed and that they cannot influence developed IT systems and working routines. This is illustrated by operative employees below:</p>
<disp-quote><p>I am not involved in the development, we get IT systems and changed working routines when they are already developed. It may happen that a colleague of mine is involved in developing, for example, a new IT system, but usually this is not the case. We (the operative employees) will get it when it is already finished. (OE1)</p></disp-quote>
<p><xref ref-type="table" rid="T5">Table 5</xref> summarizes the implement phase. The top-level managers identify contextual factors <italic>communication</italic>, <italic>leadership</italic> and <italic>organizational structures</italic> to be influential in this phase. The fact that the business is operational, and that operational delivery must be maintained during this phase are seen as contingency variables that are not adaptable. Current adaptations are mainly consisting of planning (for which the project is responsible) to ensure training for operative employees before implementation. Perceived challenges include human aspects of change, and that the implementation of changes takes place in the operational activities that must be sustained. Employees who lead projects identify the contextual factors <italic>plan for implementation and monitoring of change</italic> and <italic>organizational structures</italic> to be influential at this stage. Even in this phase, organizational structures for the areas of responsibility of organizational parts and actors are perceived as not adaptable. Current adaptation consists of clarifying the responsibilities of organizational parts and actors and comprehensive planning for implementation of change. Challenges experienced include managing issues that arise during the implementation and handovers between organizational units, to the operational activities in this phase. OE+ identify that the contextual factors <italic>involvement</italic> and <italic>plan for implementation and monitoring of change</italic> to influence at this phase. Furthermore, they perceive they cannot influence how they are involved; it is managed by the project. Adaptations made at this phase is implementation of training for colleagues as well as participation in risk analyses and risk mitigation. Perceived challenges consist of the difficulty of anticipating the impact of changes on operational activities before the change has been tested in real life environment. Operative employees identifies that the contextual factors <italic>involvement</italic> and <italic>knowledge, experience, and learning</italic> influence at this phase. How operational employees are involved, and the development of IT systems is perceived as not adaptable. In this phase, operative employees participate in training before implementing the change.</p>
<table-wrap id="T5"><label>Table 5.</label><caption><p>Implement</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Contextual factor</th>
<th align="left">Contingency variable</th>
<th align="left">Current adaptation</th>
<th align="left">Challenges</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="3"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Leadership</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Change management</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Organizational structures</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Operational activities with shift work</p></list-item><list-item><p>Maintain operational delivery</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation and monitoring of change</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Implementation of changes in operational activities that must be sustained</p></list-item>
</list></td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Employees who lead projects</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation and monitoring of change</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Manage issues that arise during to implementation</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Organizational structures</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Areas of responsibility of organizational parts and actors</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Clarifying the responsibilities of organizational parts and actors</p></list-item><list-item><p>Handovers between organizational parts</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Handovers between organizational parts</p></list-item>
</list></td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Operational employees +</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>How they are involved</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Participation in risk analyses and risk mitigation</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation and monitoring of change</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Conducts training for colleagues</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Operational employees</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>How they are involved</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Knowledge, experience, and learning</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Training</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
</tbody>
</table>
</table-wrap>
</sec>
<sec id="sec4_4"><title>Reinforce</title>
<p>In the phase of institutionalization (called reinforce by STA) there seems to be a shift in who is most active in the change, as the operational employees at this stage provide feedback while the employees leading changes plan for the end of the project and the handover to asset management. Top-level managers acknowledge that their role is to support the change in this phase and follow up if adjustments need to be made to achieve the expected benefits of the change. This is illustrated by top-level managers below:</p>
<disp-quote><p>I think we must be there all the time and follow and support if more information or if adjustments are needed. (TM1)</p></disp-quote>
<disp-quote><p>In this phase, I want to follow up and really see that I get the benefit that was intended with the change. (TM3)</p></disp-quote>
<p>Employees who lead projects perceive at this phase that their assignment is nearing the end and that it is time to hand over to the asset management where their task is to manage the new IT system (or the new way of working) and thus take care of the backlog from the project and continue with continuous improvements. Although this is a phase to institutionalize the change, the focus for employees who lead change is to identify remaining activities to manage and finish the project. This is illustrated by employees who lead projects below:</p>
<disp-quote><p>The projects are usually finished by then. I find that sometimes I get information in this phase just because they know who you are, but you are not that involved anymore. (PL4)</p></disp-quote>
<disp-quote><p>There is always something that comes up, something that needs to be adjusted. As a project manager, I am on stand-by, you stay, but need to let go quite soon. It&#x2019;s not until you let go that those last things happen. Then you can capture the last residual activities that are handed over to the asset management to handle. (PL3)</p></disp-quote>
<p>OE+ recognize that how much effort is needed in this phase depends on previous phases of the change process. These employees are often a channel for conveying feedback regarding the change implementation. This is illustrated by an OE+ below:</p>
<disp-quote><p>I perceive that if operational personnel have received training and if the implementation works out well, then the need for reinforcements in this phase is little. If, on the other hand, it is lacking, major efforts may be needed in this phase. (OE+1)</p></disp-quote>
<p>Operational employees acknowledge that they are involved in this phase as they provide feedback on the implemented change. The operative employees&#x2019; expectation is that their feedback will lead to adjustments and further development, but this is perceived to happen too slowly. This is illustrated by an Operational employee below:</p>
<disp-quote><p>I perceive that there is an ambition to follow up implementations. I perceive that my colleagues, or our group, are quite quick and willing to give feedback if we notice something that we don&#x2019;t understand or don&#x2019;t feel is working well. We bring it up at our functional meetings. (OE5)</p></disp-quote>
<p><xref ref-type="table" rid="T6">Table 6</xref> summarizes the reinforce phase. Top-level managers identify the contextual factors <italic>leadership</italic> and <italic>motive and extent of the change</italic> to influence institutionalization. Current adaptation consists of following up: partly to see if adjustments are needed but also to see that expected benefits are achieved. Employees who lead projects identify the contextual factors <italic>plan for implementation and monitoring of change</italic> and <italic>organizational structures</italic> to be influential at this phase. Organizational structures for the areas of responsibility of organizational parts and actors are identified as not adaptable since the mandate to decide on changes to these structures is at a higher organizational level. Current adaptation consists of monitoring the change implementation and the process of handing over the project to asset management. These handovers between organizational units, at this phase to asset management, are experienced as challenging. OE+ identify the contextual factors <italic>involvement</italic> and <italic>team relationships</italic> to be influential at this phase. How follow-up of the implementation is organized by the project is perceived to be not adaptable. The current adaptation consists of conducting additional training if needed and being the channel to provide feedback to the project on the implemented change to draw attention to whether adjustments need to be made. A perceived challenge is where feedback should be addressed when projects end, and asset management takes over the further development. Operational employees identify the contextual factor <italic>involvement</italic> to be influential at this phase. Operational employees perceive that how the follow-up of the implementation is organized by the project is not adaptable. The current adaptation consists of giving feedback on the implemented change. This is often done within the immediate team and conveyed to the project via OE+. A challenge is when the given feedback is not perceived to be handled within a short time.</p>
<table-wrap id="T6"><label>Table 6.</label><caption><p>Reinforce</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Contextual factor</th>
<th align="left">Contingency variable</th>
<th align="left">Current adaptation</th>
<th align="left">Challenges</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left" rowspan="2"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Leadership</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Follow up to see if adjustments are needed</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Motive and extent of the change</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Follow-up to see that expected benefits are achieved</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Employees who lead Projects</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Plan for implementation and monitoring of change</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Handle issues that involve adjusting or strengthening the implementation</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Organizational structures</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Areas of responsibility of organizational units and actors</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Hand over to asset management</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Handovers between organizational units</p></list-item>
</list></td>
</tr>
<tr>
<td align="left" rowspan="2"><bold>Operational employees +</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>How follow-up of the implementation is organized</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Give feedback</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Where feedback should be addressed</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><list list-type="bullet">
<list-item><p>Team relationships</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Additional training if needed</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><bold>Operational employees</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>How follow-up of the implementation is organized</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Give feedback</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Time perspective on handling feedback</p></list-item>
</list></td>
</tr>
</tbody>
</table>
</table-wrap>
</sec>
<sec id="sec4_5"><title>Behavioural implications</title>
<p>In this section, behavioural implications such as identified challenges and two identified contradictory behavioural patterns will be presented. When summarizing the context adaptation challenges during the change phases (see <xref ref-type="table" rid="T7">Table 7</xref>), it becomes clear that implementation of changes in operational activities that must be sustained is a challenge. Even if it is only top-level managers who point this out as a challenge, it is still clear that employees see this as a natural part of their context, so obvious that it is not pointed out.</p>
<table-wrap id="T7"><label>Table 7.</label><caption><p>Challenges related to change process phases and actors</p></caption>
<table>
<thead>
<tr>
<th align="left">Actor</th>
<th align="left">Development of change strategy</th>
<th align="left">Prepare</th>
<th align="left">Implement</th>
<th align="left">Reinforce</th>
</tr>
</thead>
<tbody>
<tr>
<td align="left"><bold>Top-level managers</bold></td>
<td align="left"><list list-type="bullet">
<list-item><p>Roles and responsibilities in steering groups</p></list-item><list-item><p>Availability of necessary resources, operational staff</p></list-item><list-item><p>Balance need for change with availability of necessary resources, operational staff</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Communication and involvement as it is not possible to gather all employees</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Change management</p></list-item><list-item><p>Implementation of changes in operational activities that must be sustained</p></list-item>
</list></td>
<td align="left">&#x00A0;</td>
</tr>
<tr>
<td align="left"><bold>Employees who lead projects</bold></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Find ways to communicate and involve operational employees</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Manage issues that arise during to implementation</p></list-item><list-item><p>Handovers between organizational units</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Handovers between organizational units</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><bold>Operational employees +</bold></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Anticipate the impact of changes on operational activities</p></list-item><list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Where feedback should be addressed</p></list-item>
</list></td>
</tr>
<tr>
<td align="left"><bold>Operational employees</bold></td>
<td align="left">&#x00A0;</td>
<td align="left"><list list-type="bullet">
<list-item><p>Involvement</p></list-item><list-item><p>Be involved instead of getting information</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Participate and contribute with expertise</p></list-item>
</list></td>
<td align="left"><list list-type="bullet">
<list-item><p>Time perspective on handling feedback</p></list-item>
</list></td>
</tr>
</tbody>
</table>
</table-wrap>
<p>The first contradictory behavioural pattern consists of managers and employees agreeing on the important contingency variable that sufficient available necessary resources (operational staff) are lacking (see <xref ref-type="table" rid="T3">Table 3</xref> and <xref ref-type="table" rid="T4">Table 4</xref>). Top-level managers further emphasize the difficulty of balancing the need for change with availability of necessary resources (operational staff) (see <xref ref-type="table" rid="T7">Table 7</xref>). This contradictory behavioural pattern can be equated with what one of the top managers perceives as a &#x2018;catch 22&#x2019; - change is needed, yet the resources to implement it are insufficient. Despite this dilemma, the perceived urgency of change appears to outweigh concerns about resource limitations when decisions regarding change are made.</p>
<p>The second contradictory behavioural pattern concerns communication and involvement (including participation and contribute with expertise) (see <xref ref-type="table" rid="T7">Table 7</xref>), which is considered as challenging by all actors. The contradictory behavioural pattern, see <xref ref-type="fig" rid="F4">Figure 4</xref>, is based on the double-sided request on involvement and participation, counter-acted by structural restrictions and lack of resources. Employees that lead projects have identified that new ways of creating involvement of operational staff are needed, which can be interpreted as current organizational structures and working methods (such as STA&#x2019;s project model and framework for change management) are not being sufficiently adapted to the context of operational activities. Since organizational structures are perceived as uninfluenceable by top-level managers and employees that lead projects, no contextual adaptation actions are not taken, which results in a lack of involvement of operational employees.</p>
<fig id="F4"><label>Figure 4.</label><caption><p>Illustration of contradictory behavioural pattern in the preparation phase</p></caption>
<graphic xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="c4-fig4.jpg"><alt-text>none</alt-text></graphic></fig>
</sec>
</sec>
<sec id="sec5"><title>Discussion</title>
<p>This section discusses the findings of the study related to how context adaptation is enacted in change processes, including behavioural implications, offering insights that may inform and inspire future research.</p>
<p>To begin with, the study identified several expected findings related to the top-down, planned approach to change that characterized the studied change process. The findings support some of the established critiques of the planned approach to organizational change - specifically, that such approaches can lead to an overreliance on top management (<xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>). In this case, top-level managers found it challenging to balance the need for change with available resources and to provide appropriate structure. The planned approach to change is consistent with previous literature within traffic management when implementing new technologies and working methods (<xref ref-type="bibr" rid="R42">Lofquist and Isaksen, 2019</xref>; <xref ref-type="bibr" rid="R43">Long <italic>et al.</italic>, 2012</xref>; <xref ref-type="bibr" rid="R63">Stathis <italic>et al.</italic>, 2022</xref>). The findings of this study also confirm previous research on ICT implementation in public administration in terms of that these change initiatives are challenging (<xref ref-type="bibr" rid="R40">Li, 2020</xref>; <xref ref-type="bibr" rid="R47">Molin and Norrman Brandt, 2023</xref>) and that public administrations adopt project management logics to achieve organizational change (<xref ref-type="bibr" rid="R10">Bonomi Savignon and Costumato, 2024</xref>).</p>
<p>Next, each studied phase of change will be discussed, starting with development of change strategy. In this phase top-level managers identify three contingency variables that require adaptation (see <xref ref-type="table" rid="T2">Table 2</xref>): (1) structures in project model and change management framework, (2) operational activities with shift work, and (3) lack of availability of necessary resources (lack of operational staff). One of the adaptations that top-level managers do, although it is perceived as a challenge, is to balance the need for change with availability of necessary resources. The contingency approach offers a useful lens for understanding why this balancing act gives rise to the first contradictory behavioural pattern. Although top-level managers collect, interpret, and process information that confirms the lack of resources, they tend to simplify decision-making by opting for satisfactory solutions such as prioritizing the need for change rather than the optimize balance between change and resources (<xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). This lack of context adaptation affects the three subsequent phases of the change process and can be interpreted as management shaping the process and thus the employees&#x2019; ability to be involved in the change process (<xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>).</p>
<p>During the prepare phase, communication and involvement (including participation and contribute with expertise) is considered challenging by all actors (see <xref ref-type="table" rid="T7">Table 7</xref>), which is highlighted by the second contradictory behavioural pattern. Operational employees+ identify communication and involvement as contextual factors, meaning communication and involvement is perceived as influenceable. Operational employees identify communication as a contingency variable which is defined by other actors. This difference in perception can explain why Operational employees+ are more positive to changes while Operational employees are more negative. Operational employees+ are included in early communication about the change (<xref ref-type="bibr" rid="R36">Khaw <italic>et al.</italic>, 2023</xref>; <xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>) and has the task of being involved (<xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>) while Operational employees form negative perceptions since they feel to be insufficiently informed (<xref ref-type="bibr" rid="R34">Jones <italic>et al.</italic>, 2008</xref>), and miss out on the critical question: &#x2018;What do I gain from this change?&#x2019; (<xref ref-type="bibr" rid="R31">Hameed <italic>et al.</italic>, 2019</xref>).</p>
<p>In the implementation phase, differences in top-level managers&#x2019; and operational employees&#x2019; perceptions of challenges are highlighted (see <xref ref-type="table" rid="T7">Table 7</xref>). While top-level managers focus on maintaining operational delivery, operational employees&#x2019; request to be involved and contribute with their expertise. In addition, employees who leads projects focus on organizational structures that result in a shift in responsibility since implementation should be handed over to asset-management. This shift between organizational units, decreases their focus on creating involvement of operational employees in this phase. Also here, issues with the non-adaptive organizational structure and related responsibility gaps contradicts operational participation. This can be illustrated as a behavioural mismatch, or vicious cycle (<xref ref-type="bibr" rid="R72">Woiceshyn <italic>et al.</italic>, 2020</xref>), where the change implementation is not done together with operational staff but rather through management directing (<xref ref-type="bibr" rid="R67">Todnem By, 2005</xref>), enhancing the management driven planned approach to change, see <xref ref-type="fig" rid="F5">Figure 5</xref>.</p>
<fig id="F5"><label>Figure 5.</label><caption><p>Illustration of behavioural mismatch in the implement phase</p></caption>
<graphic xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="c4-fig5.jpg"><alt-text>none</alt-text></graphic></fig>
<p>The last phase, reinforce, illustrates (see <xref ref-type="table" rid="T6">Table 6</xref>), what also can be seen in the other phases, that the higher-level roles create conditions for the lower-level roles. For example, operative employees identify how the follow-up of implementation is organized as a contingency variable as they cannot influence it. Instead of the operative employees, it is the employees who lead projects that are responsible for the follow-up of implementation, and it is theirs to adapt. Correspondingly, goals and vision of projects is a contingency variable in the prepare phase for employees who lead projects and operational employees when these were decided in the previous phase by top-level managers. Furthermore, top managers and employees who lead projects have greater opportunities to make adaptations which then dictate the conditions for adaptation actors further down the organization, the operational employees. This analytical finding highlights the value of applying a contingency approach to facilitate the analysis of both processes and structures, as well as their behavioural implications. While public administration literature emphasizes that the management-level can shape both the context and the process of organizational change (<xref ref-type="bibr" rid="R31">Hameed <italic>et al.</italic>, 2019</xref>; <xref ref-type="bibr" rid="R36">Khaw <italic>et al.</italic>, 2023</xref>; <xref ref-type="bibr" rid="R60">Seijts and Roberts, 2011</xref>). This study expands knowledge by illustrating that context adaptation is enacted continuously throughout the change process by both managers and employees, and that higher-level roles create conditions for lower-level roles.</p>
</sec>
<sec id="sec6"><title>Concluding Remarks</title>
<p>This paper contributes to public administration, specifically change management within traffic management, an area of research that benefits society by ensuring functioning travel and transportation. This is done by adopting a contingency approach to answer the research question: <italic>How is context adaptation enacted in change processes and what are the behavioural implications?</italic></p>
<p>This study shows that managers and employees continuously adapt change processes to the context, building on the notion that different contextual factors can be important to different actors at different phases during a change initiative (<xref ref-type="bibr" rid="R6">Balthu and Clegg, 2021</xref>). In the setting of change processes in public traffic management, contingency variables were found both at the top-level manager level and at the employee level of which the most prominent contingency variables are operational activities with shift work (24/7), maintaining operational delivery during change implementation, limited availability of necessary resources (operational staff) and factors related to communication and involvement. This study further shows that actors higher up in the organization have greater opportunities for context adaptation but at the same time dictate the conditions for actors further down the organization highlighting that context adaptation are conducted continuously by managers&#x2019; and employees&#x2019; actions.</p>
<p>This study contributes with three main theoretical implications. First, this study contributes by applying a contingency approach to contextualize the enactment of context adaptation and its behavioural implications through the phases of change in a public administration (<xref ref-type="bibr" rid="R31">Hameed <italic>et al.</italic>, 2019</xref>; <xref ref-type="bibr" rid="R32">Haug <italic>et al.</italic>, 2024</xref>; <xref ref-type="bibr" rid="R71">Turkulainen, 2022</xref>). Second, this study contributes by demonstrating both contextual factors that the actors identify as adaptable (contextual factors, such as organizational structures, values and needs of individuals, communication, plan for implementation and monitoring of change, involvement, leadership, knowledge experience and learning, team relationships, motive and extent of change) but also which factors the actors identify as not adaptable (contingency variables, such as structures in project model and change management framework, goals and visions for projects, availability of necessary resources, communication, operational activities with shift work, maintain operational delivery, how operative employees are involved, areas of responsibility of organizational units, how followup of the implementation is organized). Third, this study contributes by illustrating that context adaptation takes place at several levels in the organization by different actors. Some contextual adaptation led to contradictory behavioural patterns and mismatches that this study highlights. Furthermore, higher-level roles create conditions for lower-level roles, in regards of context adaptation.</p>
<p>Our study contributes with three managerial implications: (1) context adaptation is conducted by managers and employees continuously throughout the change process, (2) managers and employees acknowledge organizational structures as strong and not adaptable. Since higher-level role creates conditions for lower-level roles, management need to be aware of their crucial role in creating conditions for contextual adaptation for employees, (3) contradictory behavioural patterns and mismatches can arise during context adaptation. For example, in regards of balancing the need for change and the necessary available resources which can have consequences regarding lack of involvement.</p>
<p>Like all studies, this study has limitations. First, the study is carried out at an organization that adopts a top-down approach to change, which limits the possibility of conclusions for other approaches to change. Secondly, the study includes interviews with top-level managers, employees who lead projects and employees in the operational activities, while managers at other levels and employees with other roles are not included. Thirdly, this study is based on the interpretation of interviews in a specific context, which reduces the possibility of generalizable conclusions.</p>
<p>Future research is proposed to include managers at different organizational levels and employees in diverse roles in various contexts in organizations that adopt various approaches to change. Future research is suggested to expand the scope and compare e.g. Sweden with other countries, public administration with private sector and traffic management with other operational activities. To increase knowledge on how the context adaptation is perceived by different actors, future research is suggested to adopt different theoretical perspectives, for example interaction, critical discourse analysis or institutional theory and focus on the identified contradictory behavioural patterns. Since involvement was identified as an important contextual factor, future research is suggested to focus on studying levels of involvement needed for different types of change in operational activities. Finally, future research is suggested that focuses on how evaluations and learning from previous changes contribute to adaptation of future change initiatives.</p>
</sec>
<sec id="sec7"><title>Acknowledgments/Funding</title>
<p>This research was commissioned by The Swedish Transport Administration, TRV 2024/49463.</p>
</sec>
</body>
<back>
<ref-list>
<title>References</title>
<ref id="R1"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Abeygunasekera</surname><given-names>A.W.J.C.</given-names></name><name><surname>Bandara</surname><given-names>W.</given-names></name><name><surname>Wynn</surname><given-names>M.T.</given-names></name><name><surname>Yigitbasioglu</surname><given-names>O</given-names></name></person-group><year>2022</year><article-title>How to make it stick? Institutionalising process improvement initiatives</article-title><source>Business Process Management Journal</source><volume>28</volume><issue>3</issue><fpage>807</fpage><lpage>833</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/BPMJ-03-2021-0170">https://doi.org/10.1108/BPMJ-03-2021-0170</ext-link></element-citation></ref>
<ref id="R2"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Alfes</surname><given-names>K.</given-names></name><name><surname>Shantz</surname><given-names>A.D.</given-names></name><name><surname>Bailey</surname><given-names>C.</given-names></name><name><surname>Conway</surname><given-names>E.</given-names></name><name><surname>Monks</surname><given-names>K.</given-names></name><name><surname>Fu</surname><given-names>N</given-names></name></person-group><year>2019</year><article-title>Perceived human resource system strength and employee reactions toward change: Revisiting human resource&#x2019;s remit as change agent</article-title><source>Human Resource Management</source><volume>58</volume><issue>3</issue><fpage>239</fpage><lpage>252</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1002/hrm.21948">https://doi.org/10.1002/hrm.21948</ext-link></element-citation></ref>
<ref id="R3"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Al-Haddad</surname><given-names>S.</given-names></name><name><surname>Kotnour</surname><given-names>T</given-names></name></person-group><year>2015</year><article-title>Integrating the organizational change literature: a model for successful change</article-title><source>Journal of Organizational Change Management</source><volume>28</volume><issue>2</issue><fpage>234</fpage><lpage>262</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/JOCM-11-2013-0215">https://doi.org/10.1108/JOCM-11-2013-0215</ext-link></element-citation></ref>
<ref id="R4"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Alvehus</surname><given-names>J.</given-names></name><name><surname>Loodin</surname><given-names>H</given-names></name></person-group><year>2023</year><article-title>Special Issue Introduction: Making Sense of Institutional Changes in the Welfare Professions</article-title><source>Scandinavian Journal of Public Administration</source><volume>27</volume><issue>3</issue><fpage>1</fpage><lpage>6</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.58235/sjpa.v27i3.15895">https://doi.org/10.58235/sjpa.v27i3.15895</ext-link></element-citation></ref>
<ref id="R5"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Anderson</surname><given-names>S.W.</given-names></name><name><surname>Young</surname><given-names>S.M.</given-names></name></person-group><year>1999</year><article-title>The impact of contextual and process factors on the evaluation of activity-based costing systems</article-title><source>Accounting, Organizations and Society</source><volume>24</volume><issue>7</issue><fpage>525</fpage><lpage>559</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1016/S0361-3682(99)00018-5">https://doi.org/10.1016/S0361-3682(99)00018-5</ext-link></element-citation></ref>
<ref id="R6"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Balthu</surname><given-names>K.C.</given-names></name><name><surname>Clegg</surname><given-names>B</given-names></name></person-group><year>2021</year><article-title>Improving professional service operations: action research in a law firm</article-title><source>International Journal of Operations and Production Management</source><volume>41</volume><issue>6</issue><fpage>805</fpage><lpage>829</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/IJOPM-10-2020-0696">https://doi.org/10.1108/IJOPM-10-2020-0696</ext-link></element-citation></ref>
<ref id="R7"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Bamford</surname><given-names>D.R.</given-names></name><name><surname>Forrester</surname><given-names>P.L.</given-names></name></person-group><year>2003</year><article-title>Managing planned and emergent change within an operations management environment</article-title><source>International Journal of Operations &#x0026; Production Management</source><volume>23</volume><issue>5</issue><fpage>546</fpage><lpage>564</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/01443570310471857">https://doi.org/10.1108/01443570310471857</ext-link></element-citation></ref>
<ref id="R8"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Bell</surname><given-names>E.</given-names></name><name><surname>Bryman</surname><given-names>A.</given-names></name><name><surname>Harley</surname><given-names>B</given-names></name></person-group><year>2019</year><source>Business Research Methods</source><publisher-name>Oxford University Press</publisher-name></element-citation></ref>
<ref id="R9"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Biedenbach</surname><given-names>T.</given-names></name><name><surname>S&#x00F6;derholm</surname><given-names>A.</given-names></name></person-group><year>2008</year><article-title>The Challenge of Organizing Change in Hypercompetitive Industries: A Literature Review</article-title><source>Journal of Change Management</source><volume>8</volume><issue>2</issue><fpage>123</fpage><lpage>145</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14697010801953967">https://doi.org/10.1080/14697010801953967</ext-link></element-citation></ref>
<ref id="R10"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Bonomi Savignon</surname><given-names>A.</given-names></name><name><surname>Costumato</surname><given-names>L</given-names></name></person-group><year>2024</year><article-title>Project management logics for agile public strategic management: Propositions from the literature and a research agenda</article-title><source>Information Polity</source><volume>29</volume><issue>2</issue><fpage>153</fpage><lpage>178</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.3233/IP-230061">https://doi.org/10.3233/IP-230061</ext-link></element-citation></ref>
<ref id="R11"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Brandes</surname><given-names>B.</given-names></name><name><surname>Lai</surname><given-names>Y.L.</given-names></name></person-group><year>2022</year><article-title>Addressing resistance to change through a micro interpersonal lens: an investigation into the coaching process</article-title><source>Journal of Organizational Change Management</source><volume>35</volume><issue>3</issue><fpage>666</fpage><lpage>681</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/JOCM-07-2021-0214">https://doi.org/10.1108/JOCM-07-2021-0214</ext-link></element-citation></ref>
<ref id="R12"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Brazzale</surname><given-names>P.L.</given-names></name><name><surname>Cooper&#x2013;Thomas</surname><given-names>H.D.</given-names></name><name><surname>Haar</surname><given-names>J.</given-names></name><name><surname>Smollan</surname><given-names>R.K.</given-names></name></person-group><year>2021</year><article-title>Change ubiquity: employee perceptions of change prevalence from three countries</article-title><source>Personnel Review</source><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/PR-04-2019-0211">https://doi.org/10.1108/PR-04-2019-0211</ext-link></element-citation></ref>
<ref id="R13"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Brorstr&#x00F6;m</surname><given-names>S.</given-names></name><name><surname>Kallio</surname><given-names>K.-M.</given-names></name><name><surname>Karlsson</surname><given-names>T.S.</given-names></name><name><surname>Nyland</surname><given-names>K</given-names></name></person-group><year>2023</year><article-title>Call for Papers: Exploring Current Themes, Future Trends, and Challenges in Scandinavian Public Management</article-title><source>Scandinavian Journal of Public Administration</source><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.58235/sjpa.2023.18382">https://doi.org/10.58235/sjpa.2023.18382</ext-link></element-citation></ref>
<ref id="R14"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Burnes</surname><given-names>B</given-names></name></person-group><year>1996</year><article-title>No such thing as &#x2026; a &#x2018;one best way&#x2019; to manage organizational change</article-title><source>Management Decision</source><volume>34</volume><issue>10</issue><fpage>11</fpage><lpage>18</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/00251749610150649">https://doi.org/10.1108/00251749610150649</ext-link></element-citation></ref>
<ref id="R15"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Burnes</surname><given-names>B.</given-names></name></person-group><year>2004</year><source>Managing Change: A Strategic Approach to Organisational Dynamics</source><edition>4</edition><comment>ed</comment><publisher-name>Prentice Hall</publisher-name><publisher-loc>Harlow</publisher-loc></element-citation></ref>
<ref id="R16"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Chaudhry</surname><given-names>S.</given-names></name></person-group><year>2020</year><article-title>Understanding Change Enablers in Service Organizations: A Contingency Theory Perspective</article-title><source>South Asian Journal of Management</source><volume>27</volume><issue>2</issue><fpage>54</fpage><lpage>83</lpage></element-citation></ref>
<ref id="R17"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Cloutier</surname><given-names>C.</given-names></name><name><surname>Denis</surname><given-names>J.-L.</given-names></name><name><surname>Langley</surname><given-names>A.</given-names></name><name><surname>Lamothe</surname><given-names>L</given-names></name></person-group><year>2016</year><article-title>Agency at the Managerial Interface: Public Sector Reform as Institutional Work</article-title><source>Journal of Public Administration Research and Theory</source><volume>26</volume><issue>2</issue><fpage>259</fpage><lpage>276</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1093/jopart/muv009">https://doi.org/10.1093/jopart/muv009</ext-link></element-citation></ref>
<ref id="R18"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Darby</surname><given-names>J.L.</given-names></name><name><surname>Fugate</surname><given-names>B.S.</given-names></name><name><surname>Murray</surname><given-names>J.B.</given-names></name></person-group><year>2019</year><article-title>Interpretive research: A complementary approach to seeking knowledge in supply chain management</article-title><source>The International Journal of Logistics Management</source><volume>30</volume><issue>2</issue><fpage>395</fpage><lpage>413</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/IJLM-07-2018-0187">https://doi.org/10.1108/IJLM-07-2018-0187</ext-link></element-citation></ref>
<ref id="R19"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Dawson</surname><given-names>P.</given-names></name></person-group><year>1996</year><article-title>Beyond conventional change models: A processual perspective</article-title><source>Asia Pacific Journal of Human Resources</source><volume>34</volume><issue>2</issue><fpage>57</fpage><lpage>70</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/103841119603400207">https://doi.org/10.1177/103841119603400207</ext-link></element-citation></ref>
<ref id="R20"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Dmitrijeva</surname><given-names>J.</given-names></name><name><surname>Schroeder</surname><given-names>A.</given-names></name><name><surname>Ziaee Bigdeli</surname><given-names>A.</given-names></name><name><surname>Baines</surname><given-names>T</given-names></name></person-group><year>2020</year><article-title>Context matters: how internal and external factors impact servitization</article-title><source>Production Planning &#x0026; Control</source><volume>31</volume><issue>13</issue><fpage>1077</fpage><lpage>1097</lpage></element-citation></ref>
<ref id="R21"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Donaldson</surname><given-names>L.</given-names></name></person-group><year>2001</year><source>The Contingency Theory of Organizations</source><comment>Sage</comment></element-citation></ref>
<ref id="R22"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Dunphy</surname><given-names>D.</given-names></name><name><surname>Stace</surname><given-names>D</given-names></name></person-group><year>1993</year><article-title>The Strategic Management of Corporate Change</article-title><source>Human Relations</source><volume>46</volume><issue>8</issue><fpage>905</fpage><lpage>920</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/001872679304600801">https://doi.org/10.1177/001872679304600801</ext-link></element-citation></ref>
<ref id="R23"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Dunphy</surname><given-names>D.C.</given-names></name><name><surname>Stace</surname><given-names>D.A.</given-names></name></person-group><year>1988</year><article-title>Transformational and Coercive Strategies for Planned Organizational Change: Beyond the O.D. Model</article-title><source>Organization Studies</source><volume>9</volume><issue>3</issue><fpage>317</fpage><lpage>334</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/017084068800900302">https://doi.org/10.1177/017084068800900302</ext-link></element-citation></ref>
<ref id="R24"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Edmondson</surname><given-names>A.C.</given-names></name></person-group><year>2018</year><article-title>Organizational Change</article-title><comment>in</comment><person-group person-group-type="editor"><name><surname>Augier</surname><given-names>M</given-names></name><name><surname>Teece</surname><given-names>D.J.</given-names></name></person-group><comment>Eds</comment><source>The Palgrave Encyclopedia of Strategic Management</source><publisher-name>Palgrave Macmillan</publisher-name><publisher-loc>UK, London</publisher-loc><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1057/978-1-137-00772-8_767">https://doi.org/10.1057/978-1-137-00772-8_767</ext-link></element-citation></ref>
<ref id="R25"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Edwards</surname><given-names>K.</given-names></name><name><surname>Pr&#x00E6;torius</surname><given-names>T.</given-names></name><name><surname>Nielsen</surname><given-names>A.P.</given-names></name></person-group><year>2020</year><article-title>A Model of Cascading Change: Orchestrating Planned and Emergent Change to Ensure Employee Participation</article-title><source>Journal of Change Management</source><volume>20</volume><issue>4</issue><fpage>342</fpage><lpage>368</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14697017.2020.1755341">https://doi.org/10.1080/14697017.2020.1755341</ext-link></element-citation></ref>
<ref id="R26"><element-citation publication-type="journal"><person-group person-group-type="author"><collab>Ekonomistyrningsverket</collab></person-group><year>2007</year><source>V&#x00E4;gledning, Att leda f&#x00F6;r&#x00E4;ndring i offentlig verksamhet</source><comment>ESV 2017</comment><volume>70</volume></element-citation></ref>
<ref id="R27"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Frishammar</surname><given-names>J.</given-names></name></person-group><year>2006</year><article-title>Organizational Environment Revisited: A Conceptual Review and Integration</article-title><source>International Studies of Management &#x0026; Organization</source><volume>36</volume><issue>3</issue><fpage>22</fpage><lpage>49</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.2753/IMO0020-8825360302">https://doi.org/10.2753/IMO0020-8825360302</ext-link></element-citation></ref>
<ref id="R28"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Galbraith</surname><given-names>J.R.</given-names></name><name><surname>Nathanson</surname><given-names>D.A.</given-names></name></person-group><year>1978</year><source>Strategy Implementation: The Role of Structure and Process</source><comment>West</comment></element-citation></ref>
<ref id="R29"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Grant</surname><given-names>M.R.</given-names></name><name><surname>Lincoln</surname><given-names>Y</given-names></name></person-group><year>2021</year><article-title>A Conversation About Rethinking Criteria for Qualitative and Interpretive Research: Quality as Trustworthiness</article-title><source>Journal of Urban Mathematics Education</source><volume>14</volume><issue>2</issue><fpage>1</fpage><lpage>15</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.21423/jume-v14i2a403">https://doi.org/10.21423/jume-v14i2a403</ext-link></element-citation></ref>
<ref id="R30"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Hailey</surname><given-names>V.H.</given-names></name><name><surname>Balogun</surname><given-names>J</given-names></name></person-group><year>2002</year><article-title>Devising Context Sensitive Approaches To Change: The Example of Glaxo Wellcome</article-title><source>Long Range Planning</source><volume>35</volume><issue>2</issue><fpage>26</fpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1016/S0024-6301(02)00035-3">https://doi.org/10.1016/S0024-6301(02)00035-3</ext-link></element-citation></ref>
<ref id="R31"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Hameed</surname><given-names>I.</given-names></name><name><surname>Khan</surname><given-names>A.K.</given-names></name><name><surname>Sabharwal</surname><given-names>M.</given-names></name><name><surname>Arain</surname><given-names>G.A.</given-names></name><name><surname>Hameed</surname><given-names>I</given-names></name></person-group><year>2019</year><article-title>Managing Successful Change Efforts in the Public Sector: An Employee&#x2019;s Readiness for Change Perspective</article-title><source>Review of Public Personnel Administration</source><volume>39</volume><issue>3</issue><fpage>398</fpage><lpage>421</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/0734371X17729869">https://doi.org/10.1177/0734371X17729869</ext-link></element-citation></ref>
<ref id="R32"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Haug</surname><given-names>N.</given-names></name><name><surname>Dan</surname><given-names>S.</given-names></name><name><surname>Mergel</surname><given-names>I</given-names></name></person-group><year>2024</year><article-title>Digitally-induced change in the public sector: a systematic review and research agenda</article-title><source>Public Management Review</source><volume>26</volume><issue>7</issue><fpage>1963</fpage><lpage>1987</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14719037.2023.2234917">https://doi.org/10.1080/14719037.2023.2234917</ext-link></element-citation></ref>
<ref id="R33"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Hughes</surname><given-names>M.</given-names></name></person-group><year>2011</year><article-title>Do 70 Per Cent of All Organizational Change Initiatives Really Fail?</article-title><source>Journal of Change Management</source><volume>11</volume><issue>4</issue><fpage>451</fpage><lpage>464</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14697017.2011.630506">https://doi.org/10.1080/14697017.2011.630506</ext-link></element-citation></ref>
<ref id="R34"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Jones</surname><given-names>L.</given-names></name><name><surname>Watson</surname><given-names>B.</given-names></name><name><surname>Hobman</surname><given-names>E.</given-names></name><name><surname>Bordia</surname><given-names>P.</given-names></name><name><surname>Gallois</surname><given-names>C.</given-names></name><name><surname>Callan</surname><given-names>V.J.</given-names></name></person-group><year>2008</year><article-title>Employee perceptions of organizational change: impact of hierarchical level</article-title><source>Leadership &#x0026; Organization Development Journal</source><volume>29</volume><issue>4</issue><fpage>294</fpage><lpage>316</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/01437730810876122">https://doi.org/10.1108/01437730810876122</ext-link></element-citation></ref>
<ref id="R35"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Ketokivi</surname><given-names>M.</given-names></name><name><surname>Choi</surname><given-names>T</given-names></name></person-group><year>2014</year><article-title>Renaissance of case research as a scientific method</article-title><source>Journal of Operations Management</source><volume>32</volume><issue>5</issue><fpage>232</fpage><lpage>240</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1016/j.jom.2014.03.004">https://doi.org/10.1016/j.jom.2014.03.004</ext-link></element-citation></ref>
<ref id="R36"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Khaw</surname><given-names>K.W.</given-names></name><name><surname>Alnoor</surname><given-names>A.</given-names></name><name><surname>AL-Abrrow</surname><given-names>H.</given-names></name><name><surname>Tiberius</surname><given-names>V.</given-names></name><name><surname>Ganesan</surname><given-names>Y.</given-names></name><name><surname>Atshan</surname><given-names>N.A.</given-names></name></person-group><year>2023</year><article-title>Reactions towards organizational change: a systematic literature review</article-title><source>Current Psychology</source><volume>42</volume><issue>22</issue><fpage>19137</fpage><lpage>19160</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1007/s12144-022-03070-6">https://doi.org/10.1007/s12144-022-03070-6</ext-link></element-citation></ref>
<ref id="R37"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Kuipers</surname><given-names>B.S.</given-names></name><name><surname>Higgs</surname><given-names>M.</given-names></name><name><surname>Kickert</surname><given-names>W.</given-names></name><name><surname>Tummers</surname><given-names>L.</given-names></name><name><surname>Grandia</surname><given-names>J.</given-names></name><name><surname>Van Der Voet</surname><given-names>J</given-names></name></person-group><year>2014</year><article-title>The management of change in public organizations: A literature review</article-title><source>Public Administration</source><volume>92</volume><issue>1</issue><fpage>1</fpage><lpage>20</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1111/padm.12040">https://doi.org/10.1111/padm.12040</ext-link></element-citation></ref>
<ref id="R38"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Kvale</surname><given-names>S.</given-names></name></person-group><year>2022</year><source>Doing Interviews</source><publisher-name>Sage Publications Ltd</publisher-name><publisher-loc>London</publisher-loc><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.4135/9781849208963">https://doi.org/10.4135/9781849208963</ext-link></element-citation></ref>
<ref id="R39"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Lewin</surname><given-names>K.</given-names></name></person-group><year>1947</year><article-title>Frontiers in Group Dynamics: Concept, Method and Reality in Social Science; Social Equilibria and Social Change</article-title><source>Human Relations</source><volume>1</volume><issue>1</issue><fpage>5</fpage><lpage>41</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/001872674700100103">https://doi.org/10.1177/001872674700100103</ext-link></element-citation></ref>
<ref id="R40"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Li</surname><given-names>F.</given-names></name></person-group><year>2020</year><article-title>Leading digital transformation: three emerging approaches for managing the transition</article-title><source>International Journal of Operations &#x0026;amp; Production Management</source><volume>40</volume><issue>6</issue><fpage>809</fpage><lpage>817</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/IJOPM-04-2020-0202">https://doi.org/10.1108/IJOPM-04-2020-0202</ext-link></element-citation></ref>
<ref id="R41"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Liu</surname><given-names>J.</given-names></name><name><surname>Ulianov</surname><given-names>C.</given-names></name><name><surname>Hyde</surname><given-names>P.</given-names></name><name><surname>Ruscelli</surname><given-names>A.L.</given-names></name><name><surname>Cecchetti</surname><given-names>G</given-names></name></person-group><year>2022</year><article-title>Novel approach for validation of innovative modules for railway traffic management systems in a virtual environment</article-title><source>Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit</source><volume>236</volume><issue>2</issue><fpage>139</fpage><lpage>148</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/09544097211041879">https://doi.org/10.1177/09544097211041879</ext-link></element-citation></ref>
<ref id="R42"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Lofquist</surname><given-names>E.A.</given-names></name><name><surname>Isaksen</surname><given-names>S.G.</given-names></name></person-group><year>2019</year><article-title>Cleared for Takeoff? A Snapshot of Context for Change in a High-Risk Industry</article-title><source>The Journal of Applied Behavioral Science</source><volume>55</volume><issue>3</issue><fpage>277</fpage><lpage>305</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/0021886319832011">https://doi.org/10.1177/0021886319832011</ext-link></element-citation></ref>
<ref id="R43"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Long</surname><given-names>S.</given-names></name><name><surname>Gentry</surname><given-names>L.</given-names></name><name><surname>Bham</surname><given-names>G.H.</given-names></name></person-group><year>2012</year><article-title>Driver perceptions and sources of user dissatisfaction in the implementation of variable speed limit systems</article-title><source>Transport Policy</source><volume>23</volume><fpage>1</fpage><lpage>7</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1016/j.tranpol.2012.05.007">https://doi.org/10.1016/j.tranpol.2012.05.007</ext-link></element-citation></ref>
<ref id="R44"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Luthans</surname><given-names>F.</given-names></name><name><surname>Stewart</surname><given-names>T.I.</given-names></name></person-group><year>1977</year><article-title>A General contingency Theory of Management</article-title><source>Academy of Management Review</source><volume>2</volume><issue>2</issue><fpage>181</fpage><lpage>195</lpage></element-citation></ref>
<ref id="R45"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Miles</surname></name><name><surname>Huberman</surname></name><name><surname>Saldana</surname></name></person-group><year>2014</year><source>Fundamentals of Qualitative Data Analysis</source></element-citation></ref>
<ref id="R46"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Miles</surname><given-names>M.B.</given-names></name><name><surname>Huberman</surname><given-names>A.M.</given-names></name><name><surname>Salda&#x00F1;a</surname><given-names>J.</given-names></name></person-group><year>2020</year><source>Qualitative Data Analysis: A Methods Sourcebook</source><edition>4</edition><comment>edition, SAGE</comment></element-citation></ref>
<ref id="R47"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Molin</surname><given-names>F.</given-names></name><name><surname>Norrman Brandt</surname><given-names>E</given-names></name></person-group><year>2023</year><article-title>Transformational Change and Digitalization&#x2014;The Case of the Swedish Road and Transport Administration</article-title><source>Behavioral Sciences</source><volume>13</volume><issue>2</issue><fpage>110</fpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.3390/bs13020110">https://doi.org/10.3390/bs13020110</ext-link></element-citation></ref>
<ref id="R48"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Norrman</surname><given-names>A.</given-names></name><name><surname>N&#x00E4;slund</surname><given-names>D.</given-names></name></person-group><year>2025</year><article-title>Insights from an intervention of a performance measurement system covering all change steps: the paradox of informed change leadership passivity</article-title><source>Production Planning &#x0026; Control</source><fpage>1</fpage><lpage>24</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/09537287.2025.2453908">https://doi.org/10.1080/09537287.2025.2453908</ext-link></element-citation></ref>
<ref id="R49"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Nylin</surname><given-names>M.</given-names></name><name><surname>Johansson Westberg</surname><given-names>J.</given-names></name><name><surname>Lundberg</surname><given-names>J</given-names></name></person-group><year>2022</year><article-title>Reduced autonomy workspace (RAW)&#x2014;an interaction design approach for human-automation cooperation</article-title><source>Cognition, Technology &#x0026; Work</source><volume>24</volume><issue>2</issue><fpage>261</fpage><lpage>273</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1007/s10111-022-00695-2">https://doi.org/10.1007/s10111-022-00695-2</ext-link></element-citation></ref>
<ref id="R50"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>&#x00D8;vretveit</surname><given-names>J.</given-names></name><name><surname>Andreen-Sachs</surname><given-names>M.</given-names></name><name><surname>Carlsson</surname><given-names>J.</given-names></name><name><surname>Gustafsson</surname><given-names>H.</given-names></name><name><surname>Hansson</surname><given-names>J.</given-names></name><name><surname>Keller</surname><given-names>C.</given-names></name><name><surname>Lofgren</surname><given-names>S.</given-names></name><etal>et al</etal></person-group><year>2012</year><article-title>Implementing organisation and management innovations in Swedish healthcare : Lessons from a comparison of 12 cases</article-title><source>Journal of Health Organization and Management</source><volume>26</volume><issue>2</issue><fpage>237</fpage><lpage>257</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/14777261211230790">https://doi.org/10.1108/14777261211230790</ext-link></element-citation></ref>
<ref id="R51"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Patriarca</surname><given-names>R.</given-names></name><name><surname>Di Gravio</surname><given-names>G.</given-names></name><name><surname>Mancini</surname><given-names>M.</given-names></name><name><surname>Costantino</surname><given-names>F</given-names></name></person-group><year>2016</year><article-title>Change management in the ATM system: Integrating information in the preliminary system safety assessment</article-title><source>International Journal of Applied Decision Sciences</source><volume>9</volume><issue>2</issue><fpage>121</fpage><lpage>138</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1504/IJADS.2016.080123">https://doi.org/10.1504/IJADS.2016.080123</ext-link></element-citation></ref>
<ref id="R52"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Pettigrew</surname><given-names>A.M.</given-names></name></person-group><year>1990</year><article-title>Longitudinal Field Research on Change: Theory and Practice</article-title><source>Organization Science</source><volume>1</volume><issue>3</issue><fpage>267</fpage><lpage>292</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1287/orsc.1.3.267">https://doi.org/10.1287/orsc.1.3.267</ext-link></element-citation></ref>
<ref id="R53"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Pettigrew</surname><given-names>A.M.</given-names></name></person-group><year>2013</year><article-title>The Conduct of Qualitative Research in Organizational Settings</article-title><source>Corporate Governance: An International Review</source><volume>21</volume><issue>2</issue><fpage>123</fpage><lpage>126</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1111/j.1467-8683.2012.00925.x">https://doi.org/10.1111/j.1467-8683.2012.00925.x</ext-link></element-citation></ref>
<ref id="R54"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Pettigrew</surname><given-names>A.M.</given-names></name><name><surname>Woodman</surname><given-names>R.W.</given-names></name><name><surname>Cameron</surname><given-names>K.S.</given-names></name></person-group><year>2001</year><article-title>Studying Organizational Change and Development: Challenges for Future Research</article-title><source>The Academy of Management Journal</source><volume>44</volume><issue>4</issue><fpage>697</fpage><lpage>713</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.2307/3069411">https://doi.org/10.2307/3069411</ext-link></element-citation></ref>
<ref id="R55"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Prasad</surname><given-names>P.</given-names></name></person-group><year>2018</year><source>Crafting Qualitative Research | Beyond Positivist Traditions</source><publisher-name>Taylor &#x0026; Francis</publisher-name></element-citation></ref>
<ref id="R56"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Reyes-Mu&#x00F1;oz</surname><given-names>A.</given-names></name><name><surname>Barrado</surname><given-names>C.</given-names></name><name><surname>Pastor</surname><given-names>E.</given-names></name><name><surname>Royo</surname><given-names>P</given-names></name></person-group><year>2023</year><article-title>ATC Human Factors Involved in RPAS Contingency Management in Non-Segregated Airspace</article-title><source>Applied Sciences (Switzerland)</source><volume>13</volume><issue>3</issue><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.3390/app13031408">https://doi.org/10.3390/app13031408</ext-link></element-citation></ref>
<ref id="R57"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Rodham</surname><given-names>K.</given-names></name><name><surname>Fox</surname><given-names>F.</given-names></name><name><surname>Doran</surname><given-names>N</given-names></name></person-group><year>2015</year><article-title>Exploring analytical trustworthiness and the process of reaching consensus in interpretative phenomenological analysis: lost in transcription</article-title><source>International Journal of Social Research Methodology</source><volume>18</volume><issue>1</issue><fpage>59</fpage><lpage>71</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/13645579.2013.852368">https://doi.org/10.1080/13645579.2013.852368</ext-link></element-citation></ref>
<ref id="R58"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Ruslin</surname></name><name><surname>Mashuri</surname></name><name><surname>Rasak</surname></name><name><surname>Syam</surname></name></person-group><year>2022</year><article-title>Semi-structured Interview: A Methodological Reflection on the Development of a Qualitative Research Instrument in Educational Studies</article-title><source>IOSR Journal of Research &#x0026; Method in Education</source><volume>12</volume><issue>1</issue><fpage>22</fpage><lpage>29</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.9790/7388-1201052229">https://doi.org/10.9790/7388-1201052229</ext-link></element-citation></ref>
<ref id="R59"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Ryan</surname><given-names>G.W.</given-names></name><name><surname>Bernard</surname><given-names>H.R.</given-names></name></person-group><year>2003</year><article-title>Techniques to Identify Themes</article-title><source>Field Methods</source><volume>15</volume><issue>1</issue><fpage>85</fpage><lpage>109</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1177/1525822X02239569">https://doi.org/10.1177/1525822X02239569</ext-link></element-citation></ref>
<ref id="R60"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Seijts</surname><given-names>G.H.</given-names></name><name><surname>Roberts</surname><given-names>M</given-names></name></person-group><year>2011</year><article-title>The impact of employee perceptions on change in a municipal government</article-title><source>Leadership &#x0026; Organization Development Journal</source><volume>32</volume><issue>2</issue><fpage>190</fpage><lpage>213</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/01437731111113006">https://doi.org/10.1108/01437731111113006</ext-link></element-citation></ref>
<ref id="R61"><element-citation publication-type="journal"><person-group person-group-type="author"><collab>Semcon</collab></person-group><year>2024</year><source>XLPM Online</source><comment>available at</comment><ext-link ext-link-type="uri" xlink:href="https://xlpm-online.com/">https://xlpm-online.com/</ext-link></element-citation></ref>
<ref id="R62"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Silver</surname><given-names>S.A.</given-names></name><name><surname>McQuillan</surname><given-names>R.</given-names></name><name><surname>Harel</surname><given-names>Z.</given-names></name><name><surname>Weizman</surname><given-names>A.V.</given-names></name><name><surname>Thomas</surname><given-names>A.</given-names></name><name><surname>Nesrallah</surname><given-names>G.</given-names></name><name><surname>Bell</surname><given-names>C.M.</given-names></name><etal>et al</etal></person-group><year>2016</year><article-title>How to sustain change and support continuous quality improvement</article-title><source>Clinical Journal of the American Society of Nephrology</source><volume>11</volume><issue>5</issue><fpage>916</fpage><lpage>924</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.2215/CJN.11501015">https://doi.org/10.2215/CJN.11501015</ext-link></element-citation></ref>
<ref id="R63"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Stathis</surname><given-names>M.</given-names></name><name><surname>Marc</surname><given-names>B.</given-names></name><name><surname>Nora</surname><given-names>B.</given-names></name><name><surname>Tom</surname><given-names>L.</given-names></name><name><surname>Anthony</surname><given-names>S.</given-names></name><name><surname>Andrea</surname><given-names>P.</given-names></name><name><surname>Gabriele</surname><given-names>F</given-names></name></person-group><year>2022</year><article-title>Challenges from the Introduction of Artificial Intelligence in the European Air Traffic Management System</article-title><source>IFAC-PapersOnLine</source><volume>55</volume><issue>29</issue><fpage>1</fpage><lpage>6</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1016/j.ifacol.2022.09.440">https://doi.org/10.1016/j.ifacol.2022.09.440</ext-link></element-citation></ref>
<ref id="R64"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Supriharyanti</surname><given-names>E.</given-names></name><name><surname>Sukoco</surname><given-names>B.M.</given-names></name></person-group><year>2022</year><article-title>Organizational change capability: a systematic review and future research directions</article-title><source>Management Research Review</source><volume>46</volume><issue>1</issue><fpage>46</fpage><lpage>81</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1108/MRR-01-2021-0039">https://doi.org/10.1108/MRR-01-2021-0039</ext-link></element-citation></ref>
<ref id="R65"><element-citation publication-type="journal"><person-group person-group-type="author"><collab>Swedish Civil Contingencies Agency</collab></person-group><year>2024</year><source>Centre for Critical Infrastructure Protection Research (CenCIP2) 2021-2024: slutrapport</source><comment>MSB2500</comment></element-citation></ref>
<ref id="R66"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Thompson</surname><given-names>J.D.</given-names></name></person-group><year>1967</year><source>Organizations in Action: Social Science Bases of Administrative Theory</source><publisher-name>Mc Graw-Hill</publisher-name></element-citation></ref>
<ref id="R67"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Todnem By</surname><given-names>R.</given-names></name></person-group><year>2005</year><article-title>Organisational change management: A critical review</article-title><source>Journal of Change Management</source><volume>5</volume><issue>4</issue><fpage>369</fpage><lpage>380</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14697010500359250">https://doi.org/10.1080/14697010500359250</ext-link></element-citation></ref>
<ref id="R68"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Touko Tcheumadjeu</surname><given-names>L.C.</given-names></name><name><surname>Stuerz-Mutalibow</surname><given-names>K.</given-names></name><name><surname>Hoeing</surname><given-names>J.</given-names></name><name><surname>Harmann</surname><given-names>D.</given-names></name><name><surname>Glaab</surname><given-names>J.</given-names></name><name><surname>Kaul</surname><given-names>R</given-names></name></person-group><year>2022</year><article-title>New Concepts to Improve Mobility by Digitization and Virtualization: An Analysis and Evaluation of the Technical Feasibility</article-title><comment>in</comment><person-group person-group-type="editor"><name><surname>Martins</surname><given-names>A.L.</given-names></name><name><surname>Ferreira</surname><given-names>J.C.</given-names></name><name><surname>Kocian</surname><given-names>A.</given-names></name></person-group><comment>Eds</comment><source>Intelligent Transport Systems</source><volume>426</volume><fpage>26</fpage><lpage>43</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1007/978-3-030-97603-3_3">https://doi.org/10.1007/978-3-030-97603-3_3</ext-link></element-citation></ref>
<ref id="R69"><element-citation publication-type="journal"><person-group person-group-type="author"><collab>Trafikverket</collab></person-group><year>2025</year><source>About Trafikverket, Trafikverket</source><comment>available at</comment><ext-link ext-link-type="uri" xlink:href="https://bransch.trafikverket.se/en/startpage/about-us/Trafikverket/">https://bransch.trafikverket.se/en/startpage/about-us/Trafikverket/</ext-link></element-citation></ref>
<ref id="R70"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Tsoukas</surname><given-names>H.</given-names></name><name><surname>Chia</surname><given-names>R</given-names></name></person-group><year>2002</year><article-title>On Organizational Becoming: Rethinking Organizational Change</article-title><source>Organization Science</source><volume>13</volume><issue>5</issue><fpage>567</fpage><lpage>582</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1287/orsc.13.5.567.7810">https://doi.org/10.1287/orsc.13.5.567.7810</ext-link></element-citation></ref>
<ref id="R71"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Turkulainen</surname><given-names>V.</given-names></name></person-group><year>2022</year><article-title>Chapter 16: Contingency theory and the information processing view</article-title><comment>In</comment><source>Handbook of Theories for Purchasing, Supply Chain and Management Research</source><publisher-loc>Cheltenham, UK</publisher-loc><publisher-name>Edward Elgar Publishing</publisher-name><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.4337/9781839104503.00020">https://doi.org/10.4337/9781839104503.00020</ext-link></element-citation></ref>
<ref id="R72"><element-citation publication-type="journal"><person-group person-group-type="author"><name><surname>Woiceshyn</surname><given-names>J.</given-names></name><name><surname>Huq</surname><given-names>J.-L.</given-names></name><name><surname>Blades</surname><given-names>K.</given-names></name><name><surname>Pendharkar</surname><given-names>S.R.</given-names></name></person-group><year>2020</year><article-title>Microdynamics of Implementing Planned Change on Organizations&#x2019; Front Line</article-title><source>Journal of Change Management</source><volume>20</volume><issue>1</issue><fpage>59</fpage><lpage>80</lpage><comment>doi:</comment><ext-link ext-link-type="doi" xlink:href="https://doi.org/10.1080/14697017.2019.1602553">https://doi.org/10.1080/14697017.2019.1602553</ext-link></element-citation></ref>
<ref id="R73"><element-citation publication-type="book"><person-group person-group-type="author"><name><surname>Woodward</surname><given-names>J.</given-names></name></person-group><year>1966</year><source>Industrial Organization : Theory and Practice</source><publisher-name>Oxford University Press</publisher-name><publisher-loc>London</publisher-loc></element-citation></ref>
</ref-list>
<app-group>
<app id="app1">
<title>Appendix</title>
<table-wrap id="T8"><label>Appendix 1.</label><caption><p>Questions in interview guide</p></caption>
<table>
<thead>
<tr>
<th align="left"><bold>Question nr</bold></th>
<th align="left"><bold>Questions</bold></th>
</tr>
</thead>
<tbody>
<tr>
<td align="center">1</td>
<td align="left">What is your role and position in the operations at Business area Traffic managament?</td>
</tr>
<tr>
<td align="center">2</td>
<td align="left">How long have you been working at the Swedish Transport Administration?</td>
</tr>
<tr>
<td align="center">3</td>
<td align="left">How do you view your role in change processes affecting the operational activities at Business area Traffic managament?<break/>a. What mandates do you have?<break/>b. What responsibilities do you have?<break/>c. What motivates you?</td>
</tr>
<tr>
<td align="center">4</td>
<td align="left">What is your experience with previous change processes affecting the operational activities at Business area Traffic managament?</td>
</tr>
<tr>
<td align="center">5</td>
<td align="left">At which stage(s) are you involved in change processes affecting the operational activities at Business area Traffic managament?</td>
</tr>
<tr>
<td align="center">6</td>
<td align="left">Do you feel you have the opportunity to be involved to the extent needed?<break/>Yes &#x2013; How?<break/>No &#x2013; What do you think is the reason?</td>
</tr>
<tr>
<td align="center">7</td>
<td align="left">Which roles do you interact with during change processes affecting the operational activities at Business area Traffic managament?<break/>a. What is the purpose of the interaction?<break/>b. How do you interact with them?<break/>c. What do you interact with them about?</td>
</tr>
<tr>
<td align="center">8</td>
<td align="left">How would you describe the context you operate within at Business area Traffic managament?</td>
</tr>
<tr>
<td align="center">9</td>
<td align="left">How do you perceive the context affects change processes, such as projects affecting the operational activities at Business area Traffic managament?<break/>a. What in the context complicates change processes?<break/>b. What in the context facilitates change processes?<break/>c. What in the context is &#x201C;neutral&#x201D; in change processes?</td>
</tr>
<tr>
<td align="center">10</td>
<td align="left">Do you perceive that the context&#x2019;s impact on change processes varies in the three phases: unfreeze, move, refreeze?<break/>a. Yes &#x2013; How? Enablers or obstacles? What are the consequences if this is not managed? What would need to be done to manage the consequences?<break/>b. No &#x2013; What do you think is the reason?</td>
</tr>
<tr>
<td align="center">11</td>
<td align="left">Do you perceive that change processes are adapted based on the context in the operational activities?<break/>
a. Yes &#x2013; How?<break/>b. No &#x2013; What obstacles exist?</td>
</tr>
<tr>
<td align="center">12</td>
<td align="left">How would you define change management?</td>
</tr>
<tr>
<td align="center">13</td>
<td align="left">How do you perceive change management within Business area Traffic managament?<break/>a. What works well?<break/>b. What works less well?</td>
</tr>
<tr>
<td align="center">14</td>
<td align="left">Do you perceive that those leading changes (e.g., project managers, managers, and change agents) at Business area Traffic managament are aware of the context and adapt the change process accordingly?<break/>a. Yes &#x2013; How?<break/>b. No &#x2013; What do you think is the reason? What are the consequences?</td>
</tr>
<tr>
<td align="center">15</td>
<td align="left">Is there anything regarding your experience of the context at Business area Traffic managament during change processes that I have not asked about?<break/>a. Yes &#x2013; What?<break/>b. No</td>
</tr>
</tbody>
</table>
</table-wrap>
</app>
</app-group>
</back>
</article>