<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.0 20120330//EN" "http://jats.nlm.nih.gov/publishing/1.0/JATS-journalpublishing1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" article-type="research-article" xml:lang="en">
<front>
<journal-meta>
<journal-id journal-id-type="publisher-id">SJPA</journal-id>
<journal-title-group>
<journal-title>Scandinavian Journal of Public Administration</journal-title>
</journal-title-group>
<issn pub-type="epub">2001-7413</issn>
<issn pub-type="ppub">2001-7405</issn>
<publisher><publisher-name>School of Public Administration, University of Gothenburg</publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="publisher-id">sjpa.63271</article-id>
<article-id pub-id-type="doi">10.58235/sjpa.63271</article-id>
<article-categories>
<subj-group xml:lang="en">
<subject>Research article</subject>
</subj-group>
</article-categories>
<title-group>
<article-title>Developing Local Detailed Planning Processes Under Institutional Constraints: Evidence From a Finnish Municipality</article-title>
</title-group>
<contrib-group content-type="authors">
<contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-3805-9687</contrib-id><name><surname>Sulonen</surname><given-names>Kimmo</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref><xref ref-type="corresp" rid="cor1"/></contrib>
<contrib contrib-type="author" corresp="no"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0001-7438-683X</contrib-id><name><surname>Puhto</surname><given-names>Jukka</given-names></name><xref ref-type="aff" rid="aff2"><sup>2</sup></xref></contrib>
<aff id="aff1"><label>1</label><bold>Kimmo Sulonen</bold>, <institution>is affiliated with Tampere University, Finland as university researcher. His research focuses on public sector governance, real estate formation, urban and regional planning processes, and institutional dynamics in municipal decision-making. He is particularly interested in how administrative structures, leadership practices, trust, and institutional mechanisms shape efficiency and outcomes in land use processes. His work draws on institutional theory and process-oriented approaches to study governance and efficiency in public sector contexts.</institution></aff>
<aff id="aff2"><label>2</label><bold>Jukka Puhto</bold>, <institution>is affiliated with Tampere University, Finland as university researcher. His research focuses on public administration, municipal governance, and institutional processes in local government. He is particularly interested in how planning and decision-making systems operate in practice, including policy implementation, administrative coordination, and organisational change. His work applies institutional and process-oriented perspectives to examine efficiency, governance structures, and institutional dynamics in public sector planning and urban development contexts.</institution></aff>
</contrib-group>
<author-notes>
<corresp id="cor1">Corresponding Author: <email>kimmo.sulonen@tuni.fi</email></corresp>
</author-notes>
<pub-date pub-type="epub"><day>24</day><month>09</month><year>2026</year></pub-date>
<pub-date pub-type="first-pub"><day>25</day><month>06</month><year>2026</year></pub-date>
<pub-date pub-type="collection"><year>2026</year></pub-date>
<volume>30</volume>
<issue>3</issue>
<fpage>55</fpage>
<lpage>70</lpage>
<permissions>
<copyright-year>2026</copyright-year>
<copyright-holder>&#x00A9; 2026 Kimmo Sulonen, Jukka Puhto</copyright-holder>
<license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by-nc/4.0">
<license-p>This is an Open Access article distributed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (<ext-link ext-link-type="uri" xlink:href="http://creativecommons.org/licenses/by-nc/4.0/">http://creativecommons.org/licenses/by-nc/4.0/</ext-link>), permitting all non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.</license-p>
</license>
</permissions>
<abstract xml:lang="en"><title>Abstract</title><p>Finnish municipalities operating under an identical statutory framework show large variation in detailed planning performance: the national average duration of detailed plan amendments was 25.7 months (2015), while the case studied here was completed in approximately 4.7 months. This study examines how institutional conditions shape the efficiency of local detailed planning in Finland through a qualitative case study of Ilmajoki municipality, a densely populated Finnish municipality. Drawing on Scott&#x2019;s institutional pillars (regulatory, normative, and cultural&#x2013;cognitive), the study applies process tracing and thematic analysis of municipal planning documents and process-level evidence. The main contribution is a mechanism-based explanation of how institutional pillars translate into efficiency at the municipal level. Findings show that proactive administrative arrangements&#x2014;such as strengthened coordination and governance structures&#x2014;reduce lead times by preventing late-stage iterations while maintaining legality and transparency. In addition, cultural&#x2013;cognitive elements (shared routines or understanding and coordination norms) support efficiency by enabling upstream coordination and trust-based interaction under resource constraints. The study provides transferable insights for Nordic municipalities aiming to improve planning efficiency within existing legal frameworks. Limitations include a single-case design and embedded practitioner role, suggesting a need for comparative Nordic research.</p>
</abstract>
<kwd-group xml:lang="en"><title>Keywords</title>
<kwd>institutional theory</kwd>
<kwd>land use planning</kwd>
<kwd>efficiency</kwd>
<kwd>public administration</kwd>
<kwd>cultural&#x2013;cognitive</kwd>
</kwd-group>
</article-meta>
</front>
<body>
<p>
<boxed-text id="UBT0001">
<sec id="S0001"><title>Practical Relevance</title>
<p>
<list list-type="simple">
<list-item><label>&#x27A2;</label><p>Accelerating local detailed planning requires the capacity to organise and lead multi-actor processes &#x2014; making leadership and governance structures, not procedural simplification alone, the central instruments of reform.</p></list-item>
<list-item><label>&#x27A2;</label><p>Institutionalised administrative routines, such as rework of decision tools and proactive project-based scheduling, strengthen predictability and reduce avoidable waiting time within existing statutory constraints.</p></list-item>
<list-item><label>&#x27A2;</label><p>Cultural&#x2013;cognitive elements &#x2014; shared routines, coordination norms, and trust-based interaction &#x2014; enable upstream problem-solving under resource constraints, reducing late-stage iterations and making process improvements more likely to endure.</p></list-item>
</list></p>
</sec>
</boxed-text></p>
<sec id="S0002"><title>Introduction</title><p>Finnish municipalities operating under an identical national statutory framework exhibit remarkable variation in the duration of detailed planning processes. National statistics indicate that the average duration of detailed plan amendments reached 25.7 months (median 15.6 months) in 2015, compared with just 4.7 months in the case analysed in this article (<xref ref-type="bibr" rid="R0026">Rinkinen &#x0026; Kinnunen, 2017</xref>; Ilmajoki municipality records, 2023). This empirical contrast raises a fundamental institutional puzzle: why can similar planning processes under identical legal conditions produce such different outcomes&#x003F; Rather than attributing the difference solely to political priority or project simplicity, this study investigates whether organisational routines and administrative arrangements within municipalities can systematically influence planning process performance.</p>
<p>The early 2000s were characterised by deregulation and privatisation in Europe, but recent years have brought renewed attention to public regulation in response to environmental imperatives, security concerns, and technological adaptation. Improving efficiency and sustainability in public sector operations remains a widely discussed topic, with recent studies highlighting the impact of governance quality, digitalisation, and human resources on public sector performance (<xref ref-type="bibr" rid="R0020">Negri &#x0026; Dinc&#x0103;, 2023</xref>; <xref ref-type="bibr" rid="R0005">Capgemini, 2025</xref>; <xref ref-type="bibr" rid="R0015">Lobon&#x021B; et al., 2025</xref>). Public-sector resources have decreased even as the need for diverse, customer-oriented services has increased. Re-regulation commonly aims to correct market failures, safeguard public interests, and secure equitable access in sectors critical for sustainability and innovation (<xref ref-type="bibr" rid="R0018">Moghissi et al., 2014</xref>; <xref ref-type="bibr" rid="R0017">Meijer &#x0026; Visscher, 2006</xref>; <xref ref-type="bibr" rid="R0009">Eliassen &#x0026; From, 2009</xref>; <xref ref-type="bibr" rid="R0003">Araral, 2009</xref>). In the built environment, these dynamics are reflected in policy agendas related to energy efficiency, climate action, and digitalisation, which have increased expectations for administrative quality, transparency, and procedural streamlining (<xref ref-type="bibr" rid="R0024">Radaelli &#x0026; Meuwese, 2009</xref>; Directives 2010/31/EU; 2012/27/EU).</p>
<p>Local and urban planning is a key regulatory instrument shaping conditions for investment, social innovation, and well-being in everyday living environments (<xref ref-type="bibr" rid="R0014">Lehtovuori et al., 2019</xref>; <xref ref-type="bibr" rid="R0001">Ahonen, 2017</xref>), while construction-related regulation sets baseline requirements for safety, health, energy performance, and accessibility that interact with planning implementation (<xref ref-type="bibr" rid="R0021">Pedro et al., 2011</xref>).</p>
<p>Expanded regulatory and procedural expectations are, however, frequently introduced under constrained public-sector resources, creating tension between increasing obligations and declining administrative capacity (e.g. to maintain consistent and transparent processes). Prior research has noted this tension in construction-related governance, where increasing supervisory obligations combined with limited resources can generate delays and administrative burden (<xref ref-type="bibr" rid="R0017">Meijer &#x0026; Visscher, 2006</xref>; <xref ref-type="bibr" rid="R0011">J&#x00E4;&#x00E4;skel&#x00E4;inen &#x0026; Virkam&#x00E4;ki, 2013</xref>).</p>
<p>A practical and research-relevant problem is therefore how municipalities can sustain service quality, legality, and transparency while improving process performance &#x2014; particularly by reducing plan lead time and avoiding avoidable late-stage iterations. These challenges can be understood as forms of &#x2018;inefficient complexity&#x2019;: procedural and coordination complexity that absorbs capacity without proportionate gains in substantive outcomes. In land-use governance, such complexity may materialise through multi-actor coordination demands, repeated review cycles, and the accumulation of formal and informal requirements across organisational boundaries (<xref ref-type="bibr" rid="R0031">Sulonen &#x0026; Vastam&#x00E4;ki, 2021</xref>).</p>
<p>These pressures are visible in Finland, where the 2020s have included active debate on balancing public spending, administrative responsibilities, and the renewal of land-use and building legislation. Legislative reform and digitalisation efforts have aimed at a comprehensive update of the Land Use and Building Act (LUBA 132/1999), with reform work initiated in 2018 and continuing into the 2020s (YM014:00/2018; HE 101/1998; HE 139/2022; BA 751/2023; <xref ref-type="bibr" rid="R0008">Ekroos et al. 2018</xref>). Regardless of national-level reform trajectories, municipalities must deliver local detailed planning within the existing statutory environment and encounter immediate expectations to digitalise, improve predictability, and maintain due process, openness, and formal legality.</p>
<p>Explaining variation in municipal planning performance requires attention not only to the formal framework, but also to the institutional conditions shaping everyday administrative practice. Institutional theory provides insights for analysing why similar statutory frameworks can yield different performance outcomes across organisations (<xref ref-type="bibr" rid="R0028">Scott, 2008</xref>). In Scott&#x2019;s framework, regulatory, normative, and cultural&#x2013;cognitive pillars interact to stabilise and legitimate organisational behaviour. In local detailed planning, the regulatory pillar comprises statutory requirements and procedural constraints; the normative pillar reflects professional standards, role expectations, and shared notions of appropriate planning conduct; and the cultural&#x2013;cognitive pillar captures taken-for-granted routines, shared assumptions, and practical &#x2018;scripts&#x2019; for how planning work is performed.</p>
<p>Although the article is primarily grounded in institutional theory, the findings also connect to classical debates in planning theory. In particular, the results help clarify how administrative routines influence whether planning processes resemble the structured logic of the rational planning model or the iterative dynamics emphasised in communicative and incremental planning approaches (cf. <xref ref-type="bibr" rid="R0029">Stramrud, 2017</xref>; <xref ref-type="bibr" rid="R0019">M&#x00E4;ntysalo et al., 2023</xref>). Recent Nordic research has further highlighted how communicative planning theory evolved through both North American pragmatism and European sociological institutionalism, stressing the interaction between organisational structures and actor agency in planning practice (<xref ref-type="bibr" rid="R0032">Westin, 2022</xref>).</p>
<p>The institutional perspective adopted here does not replace these traditions but explains how organisational arrangements shape the degree of iteration, coordination, and predictability within planning processes, allowing flexibility on processes to focus on necessary planning purpose. This interpretation aligns particularly well with Nordic and European traditions that emphasise governance capacity, institutional settings, and collaborative problem-solving in public planning.</p>
<p>Moreover, institutional perspectives on public administration are well established, empirical research linking institutional pillars to process-level mechanisms in land-use planning remains comparatively limited (<xref ref-type="bibr" rid="R0028">Scott, 2008</xref>; <xref ref-type="bibr" rid="R0012">Kallio et al., 2016</xref>; <xref ref-type="bibr" rid="R0022">Peltonen, 2020</xref>; <xref ref-type="bibr" rid="R0025">Ranta, 2021</xref>; <xref ref-type="bibr" rid="R0031">Sulonen &#x0026; Vastam&#x00E4;ki, 2021</xref>: <xref ref-type="bibr" rid="R0004">B&#x00E4;cklund, 2007</xref>). Based on Scandinavian public administration research, a shared legal framework may produce divergent organisational outcomes due to differences in institutional complexity, coordination practices, and administrative autonomy (<xref ref-type="bibr" rid="R0013">K&#x00FC;hn, 2021</xref>; <xref ref-type="bibr" rid="R0027">R&#x00F8;nshaugen et al., 2024</xref>). Existing discussions often identify complexity, fragmentation, and change pressures, but provide fewer detailed explanations of how cultural-cognitive elements shape efficiency improvement. This constitutes a theoretical and practical gap: how can municipalities achieve shorter plan lead times within the current national legal framework through administrative arrangements and shifts in shared working practices&#x003F;</p>
<p>In this article, efficiency is defined primarily as process performance measured through plan lead time and the number of late-stage iterations. Efficiency therefore refers to the reduction of avoidable waiting periods and rework while maintaining statutory participation, legal certainty, and transparency&#x2014;as distinct from broader effectiveness.</p>
<p>This paper develops a mechanism-based explanation of how municipalities can increase efficiency in local detailed planning by reducing plan lead times within an existing legal framework, thereby translating institutional pillars into actionable process redesign at key governance interfaces. The administrative tools identified&#x2014;delegation, upstream coordination, and cross-unit leadership&#x2014;constitute a secondary best-practice account, while the observed cultural&#x2013;cognitive shifts provide a third, supporting argument about routinisation and sustainability under constrained resources.</p>
<p>This study addresses the gap through a qualitative case study of Ilmajoki municipality, examining local detailed planning as an implemented administrative process. Building on Scott&#x2019;s institutional pillars, process tracing and thematic analysis are applied to municipal planning documents and process-level evidence to identify how institutional conditions connect to observable mechanisms affecting plan lead time and late-stage iterations.</p>
<p>The study is guided by the following research questions:
<list list-type="order">
<list-item><p>How do regulatory, normative, and cultural&#x2013;cognitive institutional elements shape the organisation and performance of local detailed planning in the Ilmajoki case&#x003F;</p></list-item>
<list-item><p>What process mechanisms link these institutional elements to reduced plan lead time and fewer late-stage iterations within an unchanged national legal framework&#x003F;</p></list-item>
<list-item><p>Which administrative and managerial practices&#x2014;together with related cultural&#x2013;cognitive shifts in shared routines&#x2014;operationalise these mechanisms, and what factors hinder or enable their adoption under constrained resources&#x003F;</p></list-item>
</list></p>
<p>Empirically, the Ilmajoki case indicates that reductions in plan lead time can be achieved without legal reform by: (i) decoupling statutory public display decisions from committee meeting cycles through delegated procedures supported by structured briefings; (ii) shifting inter-organisational coordination upstream to prevent late-stage iterations; and (iii) strengthening cross-unit and cross-organisational leadership and project-based scheduling to reduce internal interface delays. These findings highlight how regulatory requirements operate as boundary conditions, how normative expectations of legality and transparency shape institutional viability, and how cultural&#x2013;cognitive routinisation stabilises new planning practices.</p>
<p>The remainder of the paper is organised as follows. The next section outlines the institutional framework guiding the analysis. The methods section describes the qualitative case study design, document corpus, and analytical strategy. The results section presents the case chronology and mechanism evidence (<xref ref-type="table" rid="T0001">Tables 1</xref>&#x2013;<xref ref-type="table" rid="T0002">2</xref>). The discussion elaborates the theoretical and practical contributions, transferability, and boundary conditions, followed by conclusions and directions for future research.</p>
</sec>
<sec id="S0003"><title>Theoretical Framework</title><p>Institutional theory explains how rules, norms, and shared interpretive frameworks become stabilised and taken for granted, shaping organisational behaviour and change over time. Within organisational fields, coercive, normative, and mimetic pressures can lead to convergence in formal structures, while still allowing meaningful variation in how processes are interpreted and enacted in practice (<xref ref-type="bibr" rid="R0007">DiMaggio &#x0026; Powell, 1983</xref>; <xref ref-type="bibr" rid="R0028">Scott, 2008</xref>). This study uses institutional theory to explain how municipalities can increase efficiency in local detailed planning without changing the national legal framework, by focusing on institutional mechanisms embedded in administrative arrangements and routines. It treats organisations as places for social structures and purposes (<xref ref-type="bibr" rid="R0023">Powell &#x0026; DiMaggio, 2012</xref>), allowing for changes to be examined at both micro and macro levels (<xref ref-type="bibr" rid="R0006">Dacin et al., 2002</xref>) e.g. on how institutions can act as significant barriers despite their innovative models (<xref ref-type="bibr" rid="R0002">Alasoini 2016</xref>).</p>
<p>Following Scott&#x2019;s three-pillar model, institutional order is sustained through regulatory, normative, and cultural&#x2013;cognitive elements (<xref ref-type="bibr" rid="R0028">Scott, 2008</xref>). The regulatory pillar comprises formal rules, oversight, and sanctions. In local detailed planning, it includes statutory procedural requirements, mandated decision points, and legal frameworks that structure the process and set boundaries for permissible streamlining. The normative pillar reflects values and role expectations that define what is considered appropriate public administration. In the planning context, these include commitments to transparency, equality, due process, and professional standards that shape how process choices are justified and contested. Planners interpret legal requirements and public participation obligations through established professional practices, including how coordination with authorities is organised, how planning documents are prepared, and how issues are resolved before formal decision stages. The normative pillar can also function conservatively &#x2014; professional norms present in public work that valorise thoroughness and caution may resist efficiency-oriented changes even when legally permissible. The cultural&#x2013;cognitive pillar captures shared understandings and taken for granted routines through which actors make sense of how planning is done. In municipal planning, cultural&#x2013;cognitive elements include habitual sequencing of tasks, assumptions about risk and acceptability, informal methods for coordination, and shared interpretations of what counts as sufficient preparation before political decision-making (cf. <xref ref-type="bibr" rid="R0031">Sulonen &#x0026; Vastam&#x00E4;ki, 2021</xref>).</p>
<p>Process performance concepts such as bottlenecks, interfaces, iterations, and rework are central to explaining how institutional arrangements produce structural process delays. A bottleneck arises when a procedural step depends on a constrained resource or schedule (e.g., a committee meeting cycle); an interface delay occurs when coordination between organisational units or actors is hindered; a late stage iteration is a return to a previously completed step due to unresolved issues; and rework refers to substantive plan revisions triggered by late-emerging conflicts. Legality and legitimacy, in this framework, are tied to the public sector&#x2019;s emphasis on good governance due process and procedural fairness, where streamlining is institutionally viable only if it preserves recognisable compliance and participatory rights (<xref ref-type="bibr" rid="R0024">Radaelli &#x0026; Meuwese, 2009</xref>).</p>
<p>Conceptually, the study links institutional conditions to planning performance through a process-mechanism model. Regulatory, normative, and cultural&#x2013;cognitive elements shape how municipalities design and enact routines, coordination practices, and decision-preparation within the detailed plan process. These routines generate observable process mechanisms&#x2014;such as early inter-organisational coordination, clarified responsibilities, cross-unit leadership, and anticipatory problem-solving&#x2014;that influence planning performance. In this context, interface quality, role clarity, and trust are not merely relational goods but process-performance variables: when actors share clear role expectations and resolve interpretive issues early, interface waiting time is reduced and rework is prevented (cf. <xref ref-type="bibr" rid="R0010">Houhala, et al. 2021</xref>; <xref ref-type="bibr" rid="R0030">Sulonen, 2020</xref>). This aligns with research on value creation at the interfaces between private and public sectors, which emphasises the importance of coordination quality and information management in collaborative processes. The model therefore treats streamlining as an institutional accomplishment in which efficiency gains must remain compatible with normative expectations of legality and transparency and become stabilised through cultural&#x2013;cognitive routinisation.</p>
</sec>
<sec id="S0004"><title>Methodology</title><p>This study employs a qualitative single-case study design to examine how institutional conditions shape the speed and conduct of local detailed planning (the detailed plan process) in Ilmajoki municipality, Finland. The unit of analysis is the municipal detailed plan process for a time-critical planning project, defined as the sequence of formal and informal actions from process initiation to municipal approval. The case was selected as an information-rich and analytically revealing instance: it involved an explicitly accelerated planning objective, concurrent organisational adjustments to planning practice, and conditions that make cultural&#x2013;cognitive and routine-based mechanisms observable in day-to-day implementation.</p>
<p>The empirical material comprises three categories of documents: (1) internal municipal documents (e.g., project drafts and versions, meeting memos, internal administrative preparations, decisions-in-preparation, and revised administrative rules and role descriptions); (2) public municipal documents (e.g., board and council agendas, minutes, formal approval decisions, and the published plan reports for the case, a school plan amendment, a residential plan extension, and an earlier residential plan, which together provide within-municipality process comparisons); and (3) national legislative and policy documents related to the Land Use and Building Act and its reform trajectory. Documents were collected to cover the full process chronology from initiation to approval and to capture key decision points, role configurations, and coordination arrangements.</p>
<p>The author was the municipal planning director of the unit responsible for detailed planning during the studied process. To mitigate risks associated with an embedded practitioner role, the analysis emphasises institutional mechanisms and organisational routines rather than individual motives. Credibility is strengthened through (a) documentary triangulation between internal and public records, (b) chronological reconstruction of events to reduce retrospective reinterpretation, and (c) explicit consideration of alternative explanations (e.g., project scope and contestation, stakeholder configuration, or legal simplicity) when assessing why plan lead time was reduced.</p>
<p>The embedded practitioner role also affects how cultural&#x2013;cognitive elements can be observed. Because the study relies primarily on documentary material rather than interviews, shared assumptions and routines are inferred through observable documentary indicators such as recurrent briefing formats, documented scheduling practices, pre-discussion meeting protocols, and the application of delegation as a normalised procedure. These documentary traces are presented in Appendix B.</p>
<p>Analysis proceeded in two integrated steps. First, process tracing was used to reconstruct the causal sequence of actions and decisions and to identify candidate mechanisms linking institutional conditions to planning performance (plan lead time and late-stage iterations). The process was mapped into key phases (initiation, preparation, coordination, public display, decision-making, approval) and examined for temporal ordering and decision dependencies. Second, thematic analysis was applied to the document corpus for the case and additional planning projects for comparison from the municipality, using a hybrid coding approach. Deductive codes were derived from Scott&#x2019;s institutional pillars (regulatory, normative, cultural&#x2013;cognitive), operationalised for the planning context. Inductive codes captured locally specific administrative arrangements and routines. Themes were integrated with the process map to identify how pillar-related elements interacted across phases.</p>
<p>To strengthen causal inference, the process-tracing analysis specified in advance the observable implications of three hypothesised mechanisms and three rival explanations. The proposed mechanisms were: (1) delegated display decisions reduce committee-cycle waiting time; (2) upstream coordination reduces late-stage iterations and rework; and (3) project-based cross-unit leadership reduces internal interface delays. These claims were assessed against rival explanations centred on political prioritisation, low contestation or technical simplicity, and a favourable stakeholder configuration. For each explanation, the analysis asked what documentary traces should be visible if that explanation were central to the observed sequence. For example, schedule compression without altered routines would support a priority-based account, whereas repeated evidence of changed decision authority, pre-display issue resolution, and active dependency management would support the institutional-mechanism account.</p>
<p>Evidence was then interpreted using standard process-tracing logic. Hoop-test evidence was used to assess whether each proposed mechanism was at least necessary for the observed sequence; the absence of documentary traces of delegation, pre-discussion coordination, or project-based scheduling would have weakened the mechanism claims decisively. Smoking-gun evidence consisted of documents directly linking an institutional arrangement to reduced waiting time or rework, such as the delegation rule enabling official-level display decisions, pre-discussion records showing issues resolved before formal consultation, and project schedules identifying critical dependencies early. Straw-in-the-wind evidence comprised supportive but non-decisive traces, such as brief non-objecting authority statements, repeated briefing formats, and the absence of late-stage returns for revision. This structure was used to distinguish institutional mechanisms from contextual enabling conditions rather than to treat all favourable circumstances as equivalent causes.</p>
<p><xref rid="app0001">Appendix A</xref> presents a three-case comparative process summary. A residential plan approved before 2022, represents planning conducted under the standard previous methods and is consistent with national performance benchmarks from that period (<xref ref-type="bibr" rid="R0026">Rinkinen &#x0026; Kinnunen, 2017</xref>). The case plan and an additional residential plan were both processed during the new-methods period (2022&#x2013; 2024), applying delegated display decisions and upstream coordination. This design allows the analysis to distinguish the effects of institutional arrangements from project-type differences, since the same planning unit produced all three processes under the same statutory framework.</p>
<p>The study aims for analytical generalisation by developing a process-based explanation of how institutional pillars translate into mechanisms affecting planning performance within a stable national legal framework. Limitations include the single-case design and the embedded practitioner role; future research should compare multiple municipalities and planning projects across the Nordic region to assess transferability and boundary conditions.</p>
</sec>
<sec id="S0005"><title>Results</title><p>This section reports findings from the Ilmajoki case study. Planning performance is assessed using plan lead time, defined as the period between initiation and approval of the detailed plan (<xref ref-type="bibr" rid="R0026">Rinkinen &#x0026; Kinnunen, 2017</xref>). Nationally, detailed plan amendments have become slower over time: the median duration increased from 9.9 months (2004) to 15.6 months (2015), and the average duration from 14.6 months (2004) to 25.7 months (2015) (<xref ref-type="bibr" rid="R0026">Rinkinen &#x0026; Kinnunen, 2017</xref>). The Ilmajoki case, at 4.7 months, thus represents a substantial departure from national norms, and from the municipality&#x2019;s own performance prior to the introduction of the new administrative arrangements (cf. <xref rid="app0001">Appendix A</xref>).</p>
<p>The case concerns a detailed plan amendment in the rural village centre of Area B, where already planned residential blocks were amended for school use. The amendment was part of a municipal school programme consolidating multiple schools into a more centralised location and replacing outdated facilities. The municipal council selected the site in spring 2023 and set a time-critical objective for construction, with a target schedule of six months. The amendment was initiated on 17 May 2023 by a municipal board decision and approved on 9 October 2023, resulting in a plan lead time of approximately 4.7 months.</p>
<p>To make the process sequence explicit for the process-tracing analysis, <xref ref-type="table" rid="T0001">Table 1</xref> reconstructs the key events and decision points from initiation to approval. This chronology provides the temporal backbone for assessing how administrative arrangements and routines translated into reduced waiting time and fewer late-stage iterations.</p>
<table-wrap id="T0001" position="float"><label>Table 1.</label><caption><p><italic>Process timeline and mechanism-relevant events in the Ilmajoki detailed plan process (Area B case), May&#x2013;October 2023.</italic></p></caption>
<table><thead>
<tr>
<th valign="top" align="left">Date/period</th>
<th valign="top" align="left">Process phase/decision point</th>
<th valign="top" align="left">Mechanism-relevant practice/event</th>
<th valign="top" align="left">Institutional pillar(s)</th>
</tr></thead>
<tbody>
<tr>
<td valign="top" align="left">Early 2023</td>
<td valign="top" align="left">Political steering/project initiation</td>
<td valign="top" align="left">Municipal council selects the school site, establishing a time-critical target schedule (six months).</td>
<td valign="top" align="left">Regulatory; Normative</td>
</tr>
<tr>
<td valign="top" align="left">17 May 2023</td>
<td valign="top" align="left">Decision to initiate planning</td>
<td valign="top" align="left">Municipal council formally initiates the local detail plan amendment.</td>
<td valign="top" align="left">Regulatory</td>
</tr>
<tr>
<td valign="top" align="left">May&#x2013;June 2023</td>
<td valign="top" align="left">Preparation/internal coordination<break/>Formal notice of initiation</td>
<td valign="top" align="left">Project-based scheduling introduced with cross-unit leadership and continuous specialist involvement; early identification of dependencies and statement needs (reducing internal interface delays and re-familiarisation costs).<break/>Formal initiation notice.</td>
<td valign="top" align="left">Cultural&#x2013;cognitive; Normative</td>
</tr>
<tr>
<td valign="top" align="left">5.-22. Jun<break/>2023</td>
<td valign="top" align="left">Participation plan/Draft stage<break/>/ statutory public display</td>
<td valign="top" align="left">Delegated official-level decision on statutory public display; political actors briefed in parallel (maintaining legality and transparency while avoiding dependency on committee level cycles).</td>
<td valign="top" align="left">Regulatory; Normative; Cultural&#x2013;cognitive</td>
</tr>
<tr>
<td valign="top" align="left">June&#x2013;July 2023</td>
<td valign="top" align="left">Upstream inter-organisational coordination</td>
<td valign="top" align="left">Pre-discussions and working meetings with relevant authorities and stakeholders; formal consultation initiated only where necessary (reducing late-stage iterations and rework; generating trust and role clarity).</td>
<td valign="top" align="left">Cultural&#x2013;cognitive; Normative</td>
</tr>
<tr>
<td valign="top" align="left">16.Aug -18. Sep.2023</td>
<td valign="top" align="left">Proposal stage/statutory public display</td>
<td valign="top" align="left">Delegated official-level decision on proposed plan display; remaining issues resolved with limited late-stage revisions (iteration prevention via upstream coordination).</td>
<td valign="top" align="left">Regulatory; Normative; Cultural&#x2013;cognitive</td>
</tr>
<tr>
<td valign="top" align="left">9 Oct 2023</td>
<td valign="top" align="left">Approval</td>
<td valign="top" align="left">Plan approved; plan lead time &#x2248;<break/>4.7 months from initiation to approval.</td>
<td valign="top" align="left">Regulatory</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>Process tracing and document analysis indicate that the reduced plan lead time was achieved by <italic>reconfiguring administrative arrangements and routines</italic> in ways that reduced waiting time and prevented late-stage iterations while maintaining legality and transparency. <xref ref-type="table" rid="T0002">Table 2</xref> summarises the operational changes and their expected effects.</p>
<table-wrap id="T0002" position="float"><label>Table 2.</label><caption><p><italic>Operational Changes in Ilmajoki&#x2019;s Detailed Planning Process</italic></p></caption>
<table><thead>
<tr>
<th valign="top" align="left">Function</th>
<th valign="top" align="left">Pillar(s)</th>
<th valign="top" align="left">Previous practice</th>
<th valign="top" align="left">Change</th>
<th valign="top" align="left">Expected effects</th>
</tr></thead>
<tbody>
<tr>
<td valign="top" align="left">Public display of draft detailed plan</td>
<td valign="top" align="left">Regulatory; Normative; Cultural&#x2013;cognitive</td>
<td valign="top" align="left">Display linked to committee schedule (approx. 8&#x2013;10 meetings/year).</td>
<td valign="top" align="left">Official-level delegated decision on public display; separate briefing for political decision-makers.</td>
<td valign="top" align="left">Reduces schedule dependency on committee cycles; enables earlier feedback.</td>
</tr>
<tr>
<td valign="top" align="left">Public display of proposed detailed plan</td>
<td valign="top" align="left">Normative; Cultural&#x2013;cognitive (and regulatory compliance anticipated)</td>
<td valign="top" align="left">Display linked to committee schedule (approx. 8&#x2013;10 meetings/year).</td>
<td valign="top" align="left">Official-level delegated decision; separate briefing for political decision-makers.</td>
<td valign="top" align="left">Shortens overall duration; maintains transparency with targeted briefings.</td>
</tr>
<tr>
<td valign="top" align="left">Authority consultations and statements</td>
<td valign="top" align="left">Cultural&#x2013;cognitive; Normative</td>
<td valign="top" align="left">Planner invites authorities to formal meeting and requests statements after display phases.</td>
<td valign="top" align="left">Pre-discuss key issues and hold working meetings before formal invitations; formal consultations initiated only if necessary.</td>
<td valign="top" align="left">Fewer formal statements; less rework; earlier issue resolution and shorter lead times.</td>
</tr>
<tr>
<td valign="top" align="left">Project scheduling and active management</td>
<td valign="top" align="left">Cultural&#x2013;cognitive; Normative</td>
<td valign="top" align="left">Phased schedules without strong overall timetable; specialist input episodic.</td>
<td valign="top" align="left">Shift to project-based planning with active cross-unit leadership, critical-path management, and continuous specialist involvement.</td>
<td valign="top" align="left">Less redrawing and re-familiarisation; clearer critical-path management (resource intensive for management).</td>
</tr>
<tr>
<td valign="top" align="left">Use of minor plan amendments</td>
<td valign="top" align="left">Cultural&#x2013;cognitive; Normative; Regulatory</td>
<td valign="top" align="left">Land-use changes seldom considered &#x2018;minor&#x2019;.</td>
<td valign="top" align="left">Broader, legally informed use of minor amendment procedure when criteria are met.</td>
<td valign="top" align="left">Lower workload and shorter durations; potential appeal risk managed through legal due diligence.</td>
</tr>
</tbody>
</table>
</table-wrap>
<p><xref ref-type="table" rid="T0002">Table 2</xref> shows that the streamlining affected who made certain preparatory display decisions and when coordination occurred, not whether statutory publicity, consultation, approval, or appeal opportunities applied. In this sense, the accelerated process preserved legality and transparency through unchanged formal notice, display, statement-processing, final approval, and public documentation requirements.</p>
<p>Mechanism 1: Decoupling critical-path procedural steps from political committee meeting cycles (<xref ref-type="table" rid="T0002">Table 2</xref>). In many municipalities, placing draft and proposed plans on statutory public display is tightly coupled to committee and board schedules (often 8&#x2013;10 meetings per year), affecting the waiting duration of the process. In Ilmajoki municipality, an administrative rule change enabled official-level decisions on statutory public display for both draft and proposed plan stages, while political decision-makers were kept informed through separate, structured briefings. This arrangement reduced plan lead time by removing dependency on the committee meeting cycle while preserving statutory participation rights and maintaining transparency through public documentation. In pillar terms (RQ1), the regulatory pillar functioned as a boundary condition (statutory display requirements remained); the normative pillar shaped the design of the change (maintaining legitimacy through openness and due process); and the cultural&#x2013;cognitive pillar supported adoption by establishing a new taken-for-granted briefing routine. Mechanistically (RQ2), the key causal pathway was reduced waiting time at formal interfaces: decoupling compressed the critical path by eliminating at least one committee-dependent delay window at each of two display stages.</p>
<p>Mechanism 2: Upstream coordination reducing rework and late-stage iterations (<xref ref-type="table" rid="T0002">Table 2</xref>). Rather than relying primarily on formal authority consultations after public display phases, planning practice emphasised pre-discussions and working meetings with relevant authorities early in the process, with formal consultations initiated only when necessary.&#x2013;This shifted coordination to an earlier phase, when design choices and interpretations were still more conveniently adjustable. In process terms, early coordination reduces the likelihood that substantive issues (e.g., interpretive disagreements, technical constraints, or laborious preparation of official responses when not needed) surface only after display, which typically triggers additional revision cycles and can reopen previously settled questions. In the case, early working interactions functioned as a preventive mechanism: issues were identified and resolved, generating trust and openness in the discussions.</p>
<p>Based on pillar interaction (RQ1), the normative pillar supports early engagement as a legitimate way to reduce surprises; while the cultural&#x2013;cognitive pillar is visible in the routinisation of pre-discussion practices and the trust and role clarity they generate. Mechanistically (RQ2), early coordination prevents conflicting interpretations from emerging late, resulting in fewer late-stage iterations and a shorter plan lead time.</p>
<p><italic>Mechanism 3: Project-based planning with strengthened cross-unit leadership and clarified responsibilities</italic> (<xref ref-type="table" rid="T0002">Table 2</xref>). The case indicates a shift away from vaguely phased schedules and specialist input toward more continuous cross-unit involvement and critical-path management. Under constrained resources, discontinuities in scheduling often cause re-familiarisation costs. In pillar terms (RQ1) aforementioned shifts reflect a cultural&#x2013;cognitive change in how planning work is conceptualised from episodic task completion to project-based critical path management supported by normative expectations of accountable and predictable administration. Mechanistically (RQ2), fewer internal bottlenecks and less waiting time at organisational interfaces produce a shorter plan lead time.</p>
<p><italic>Legality and transparency</italic> operated as normative requirements shaping which types of streamlining were institutionally viable. The revised process altered the timing and locus of preparatory decisions and coordination, but not the existence of statutory notice, public display, formal statement-processing, final approval, or appeal channels. In practice (RQ3), the adoption of new methods therefore required not only administrative basis and trust as well as recognisable transparency (e.g. procedural continuity, accessible documentation, and political briefings). Similarly, upstream coordination complemented rather than replaced statutory participation. The results support the proposition that accelerated planning outcomes are most likely when the three pillars align and when cultural&#x2013;cognitive routines with trust stabilise new practices as taken-for-granted ways of working.</p>
<p>Taken together, the Ilmajoki case provides a process-based explanation of accelerated detailed planning (RQ2): reduced plan lead time was achieved by (i) removing schedule dependency at key interfaces (display decisions), (ii) shifting coordination upstream to prevent late-stage iterations, and (iii) strengthening cross-unit leadership and proactive scheduling to reduce internal waiting time. These outcomes were enabled by organisational and managerial practices (RQ3): delegation and briefing routines, early working meetings with authorities, project-based scheduling, and continuous specialist involvement&#x2014;while remaining compatible with normative expectations of legality and transparency. (see <xref rid="app0002">Appendix B</xref>) The case thereby illustrates how institutional pillars interact in municipal planning practice (RQ1) and how cultural&#x2013;cognitive shifts in shared routines can support efficiency under constrained resources without legal reform.</p>
</sec>
<sec id="S0006"><title>Discussion</title><p>The Ilmajoki case provides a process-based explanation of how municipalities can increase efficiency in local detailed planning under an unchanged national legal framework by reconfiguring administrative arrangements and establishing upstream coordination routines. Across the traced sequence from initiation to approval, the findings suggest that accelerated outcomes were achieved primarily by (i) reducing schedule dependency at critical interfaces, (ii) preventing late-stage iterations through early coordination, and (iii) establishing cross-unit leadership and proactive scheduling. The changes were institutionally conditioned as they remained compatible with <italic>legality and transparency</italic> and were stabilised as taken-for-granted routines.</p>
<p>Concerning <italic>RQ1</italic>, the results illustrate how the <italic>regulatory pillar</italic> operates not merely as a constraint but as a structure around which municipalities organise compliance work. Performance gains emerged through <italic>anticipating</italic> regulatory requirements and organising work around them upstream. The <italic>normative pillar</italic>&#x2014;expectations of due process, transparency, and fair treatment&#x2014;strongly influenced which streamlining moves were acceptable and how they were justified, including the proactive involvement of stakeholders (e.g. citizens, political decision makers). The <italic>cultural&#x2013;cognitive pillar</italic> was visible in the establishment of routines of anticipatory problem-solving and planning project management. In effect, the case supports the view that variation in planning performance under a common legal framework can be explained by differences in how institutional pillars are enacted through routines and coordination practices.</p>
<p>Regarding RQ2, the three mechanisms are each supported by documentary evidence <xref rid="app0001">appendix A</xref> presents three cases, one of which was processed under the previous methods and is mainly consistent with national performance benchmarks (median 15.6 months: average 25.7 months). The case plan and an additional plan were processed under the new administrative arrangements introduced and analysed in this study, e.g. including delegated display decisions and upstream coordination. The combined evidence from these cases indicate that the full set of upstream coordination practices&#x2014;particularly pre-display working meetings with all relevant authorities&#x2014;matters in addition to delegated display decisions alone.</p>
<p>The study&#x2019;s primary contribution is a mechanism-based explanation linking institutional pillars and process efficiency specifying where and how complexity is reduced while maintaining legitimacy (as public process). As a secondary contribution, the administrative tools identified provide a practically actionable account for Nordic municipalities. The observed cultural&#x2013;cognitive shifts offer a third, supporting argument: process improvements are more likely to endure when they become established routines rather than imposed rules.</p>
<p>With respect to <italic>RQ3</italic>, the case indicates that streamlining depended on a specific configuration of organisational and managerial practices. Trust had a key enabling role: when actors shared clear role expectations, early coordination was accepted as a legitimate substitute for formal consultation in many instances.</p>
<p><xref rid="app0001">Appendix A</xref> allows the main rival explanations to be assessed as competing rather than merely contextual accounts. Political prioritisation is clearly present in Area B, but it is not sufficient on its own because the explanatory force of the case lies in how time pressure was translated into altered routines and shorter critical-path intervals. Low contestation is likewise part of the explanation, yet it cannot by itself account for the observed compression: few objections reduce friction, but they do not automatically produce delegated display decisions, pre-display problem-solving, or tighter cross-unit scheduling. Technical simplicity also remains only a partial account, since the case still involved groundwater, acid sulphate soil, fuel-storage proximity, and other issues that required anticipatory resolution rather than no resolution. The comparative inference is therefore that political priority, limited contestation, and a favourable stakeholder setting functioned as enabling conditions, whereas the institutional arrangements explain how those favourable conditions were converted into actual procedural time savings.</p>
<p>Regarding transferability, the administrative tools identified&#x2014;delegation, upstream coordination, and project-based scheduling&#x2014;target common bottlenecks in detailed planning processes that are present regardless of project type. The analysis suggests that the observed efficiency methods could operate favourably under different project conditions. They are transferable in principle, although the magnitude of lead-time reductions will depend on project complexity and the municipality&#x2019;s administrative capacity. The claims are analytical rather than statistical: the case identifies mechanisms and enabling conditions that are transferable in principle within the Finnish statutory framework and, by extension, across Nordic systems sharing comparable procedural logics.</p>
<p>Limitations should be acknowledged consistently with the methodological design. The study relies on a single case. The embedded practitioner role provides rich access to internal documents and routines but also introduces potential interpretive bias, despite documentary triangulation. Future research should therefore pursue comparative designs across multiple municipalities and planning projects, ideally combining process tracing with structured cross-case comparison. Such research could test whether the same mechanisms operate under higher contestation, in larger urban municipalities, or under different governance arrangements.</p>
<p>Overall, the study case supports the conclusion that accelerated local detailed planning under an unchanged legal framework is institutionally achievable when municipalities redesign process governance to improve efficiency and use limited resources more sustainably by reducing process duration.</p>
</sec>
<sec id="S0007"><title>Conclusion</title><p>This study examined how institutional conditions shape the speed and conduct of local detailed planning in Finland through a qualitative case study of Ilmajoki municipality. Building on Scott&#x2019;s three institutional pillars and using process tracing and thematic analysis, the study developed a process-based explanation of how municipalities can reduce <italic>plan lead time</italic> without changing the national legal framework.</p>
<p>The findings show that acceleration was achieved primarily through administrative and managerial arrangements that reconfigured the planning process considering statutory requirements. Three mechanisms were central: (1) decoupling critical-path procedural steps from political committee meeting cycles through delegated public display decisions supported by structured briefings; (2) shifting inter-organisational coordination upstream to prevent late-stage iterations and rework; and (3) strengthening cross-unit leadership and project-based scheduling to compress internal information exchange and reduce discontinuities under constrained resources. Across these mechanisms, the regulatory pillar acted as a stable boundary condition, the normative pillar shaped legitimacy and acceptability through expectations of legality and transparency, and cultural&#x2013;cognitive shifts&#x2014;evidenced in recurring briefing formats, scheduling discipline, and pre-discussion protocols&#x2014; stabilised new routines as established ways of working. The case thus supports the proposition that accelerated planning outcomes are most likely when the three pillars align, with the cultural-cognitive pillar playing a particularly important and underexplored role in public process reorganisation. The comprehensiveness of upstream coordination is a necessary condition alongside delegated display decisions.</p>
<p>The study contributes to research on planning implementation by operationalising institutional pillars in a municipal process context and linking them to observable performance outcomes through explicit mechanisms. Practically, the results suggest that Nordic municipalities seeking to streamline detailed planning should focus on (i) redesigning governance interfaces that generate avoidable waiting, (ii) treating early inter-organisational coordination as a core performance mechanism, and (iii) investing in cross-unit leadership and critical-path management to reduce rework and internal delays, while maintaining transparency and due process.</p>
<p>Moreover, the cultural&#x2013;cognitive pillar may also help explain why locally successful process improvements rarely diffuse to the national level: shared interpretive frameworks and informal rules are organisation-specific, and their transfer requires active institutional work and change management. Future research should therefore compare multiple municipalities and planning projects across the Nordic region to test mechanism transferability and identify boundary conditions.</p>
</sec>
<sec id="S0008"><title>Acknowledgements/Funding</title>
<p>This research received no specific grant from any funding agency in the public, commercial, or not-for-profit sectors. Both authors are affiliated with Tampere University.</p>
</sec>
</body>
<back>
<ref-list><title>A) References</title>
<ref id="R0001"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ahonen</surname>, <given-names>A.</given-names></string-name></person-group> (<year>2017</year>). <article-title>Tarjonnan tiell&#x00E4; &#x2013; rakentamisen s&#x00E4;&#x00E4;ntely ja paradigmaattisen muutoksen tarve (Kilpailu- ja kuluttajaviraston selvityksi&#x00E4; 1/2017)</article-title>. <source>Kilpailu- ja kuluttajavirasto</source>.</mixed-citation></ref>
<ref id="R0002"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Alasoini</surname>, <given-names>T.</given-names></string-name></person-group> (<year>2016</year>). <source>Workplace development programmes as institutional entrepreneurs</source> (<comment>Doctoral dissertation</comment>). <publisher-name>Aalto University</publisher-name>.</mixed-citation></ref>
<ref id="R0003"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Araral</surname>, <given-names>E.</given-names></string-name></person-group> (<year>2009</year>). <article-title>Privatization and regulation of public services: A framework for institutional analysis</article-title>. <source>Policy and Society</source>, <volume>27</volume>(<issue>3</issue>), <fpage>175</fpage>&#x2013;<lpage>180</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.polsoc.2008.10.008">https://doi.org/10.1016/j.polsoc.2008.10.008</ext-link></mixed-citation></ref>
<ref id="R0004"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>B&#x00E4;cklund</surname>, <given-names>P.</given-names></string-name></person-group> (<year>2007</year>). <source>Tiet&#x00E4;misen politiikka: Kokemuksellinen tieto kunnan hallinnassa</source> (<comment>Doctoral dissertation</comment>). <publisher-name>University of Helsinki</publisher-name>.</mixed-citation></ref>
<ref id="R0005"><mixed-citation publication-type="book"><collab>Capgemini</collab>. (<year>2025</year>). <source>eGovernment Benchmark 2025: Digitalisation of public services in the EU accelerates, but cybersecurity and cross-border challenges remain</source>. <publisher-name>Capgemini Research Institute</publisher-name>.</mixed-citation></ref>
<ref id="R0006"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Dacin</surname>, <given-names>T. M.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Goodstein</surname>, <given-names>J.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Scott</surname>, <given-names>W. R.</given-names></string-name></person-group> (<year>2002</year>). <article-title>Institutional theory and institutional change: Introduction</article-title>. <source>Academy of Management Journal</source>, <volume>45</volume>(<issue>1</issue>), <fpage>45</fpage>&#x2013;<lpage>56</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.2307/3069284">https://doi.org/10.2307/3069284</ext-link></mixed-citation></ref>
<ref id="R0007"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>DiMaggio</surname>, <given-names>P. J.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Powell</surname>, <given-names>W. W.</given-names></string-name></person-group> (<year>1983</year>). <article-title>The iron cage revisited: Institutional isomorphism and collective rationality</article-title>. <source>American Sociological Review</source>, <volume>48</volume>(<issue>2</issue>), <fpage>147</fpage>&#x2013;<lpage>160</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.2307/2095101">https://doi.org/10.2307/2095101</ext-link></mixed-citation></ref>
<ref id="R0008"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Ekroos</surname>, <given-names>A.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Katajam&#x00E4;ki</surname>, <given-names>H.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Kinnunen</surname>, <given-names>H.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Lehtovuori</surname>, <given-names>P.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Staffans</surname>, <given-names>A.</given-names></string-name></person-group> (<year>2018</year>). <article-title>Reforming the guidance of land use and building (Publications of the Ministry of the Environment 7/2018)</article-title>. <source>Ministry of the Environment</source>.</mixed-citation></ref>
<ref id="R0009"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Eliassen</surname>, <given-names>K. A.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>From</surname>, <given-names>J.</given-names></string-name></person-group> (<year>2009</year>). <article-title>Deregulation, privatisation and public service delivery</article-title>. <source>Policy and Society</source>, <volume>27</volume>(<issue>3</issue>), <fpage>239</fpage>&#x2013;<lpage>248</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.polsoc.2008.10.001">https://doi.org/10.1016/j.polsoc.2008.10.001</ext-link></mixed-citation></ref>
<ref id="R0010"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Houhala</surname>, <given-names>K.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Salminen</surname>, <given-names>V.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Kantola</surname>, <given-names>J.</given-names></string-name></person-group> (<year>2021</year>). <chapter-title>Value Creation at the Private and Public Sector Interface</chapter-title>. In: <person-group person-group-type="editor"><string-name><surname>Kantola</surname>, <given-names>J.I.</given-names></string-name></person-group>, <person-group person-group-type="editor"><string-name><surname>Nazir</surname>, <given-names>S.</given-names></string-name></person-group>, <person-group person-group-type="editor"><string-name><surname>Salminen</surname>, <given-names>V.</given-names></string-name></person-group> (eds) <source>Advances in Human Factors, Business Management and Leadership. AHFE 2021. Lecture Notes in Networks and Systems</source>, vol <volume>267</volume>. <publisher-name>Springer</publisher-name>, <publisher-loc>Cham</publisher-loc>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1007/978-3-030-80876-1&#x005F;31">https://doi.org/10.1007/978-3-030-80876-1&#x005F;31</ext-link></mixed-citation></ref>
<ref id="R0011"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>J&#x00E4;&#x00E4;skel&#x00E4;inen</surname>, <given-names>L.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Virkam&#x00E4;ki</surname>, <given-names>P.</given-names></string-name></person-group> (<year>2013</year>). <article-title>Rakentamisen ohjausj&#x00E4;rjestelm&#x00E4;n toimivuus</article-title>. <source>RTY ry &#x0026; Ministry of the Environment</source>.</mixed-citation></ref>
<ref id="R0012"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Kallio</surname>, <given-names>K. M.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Kallio</surname>, <given-names>T. J.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Tienari</surname>, <given-names>J.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Hyv&#x00F6;nen</surname>, <given-names>T.</given-names></string-name></person-group> (<year>2016</year>). <article-title>Ethos at stake: Performance management and academic work in universities</article-title>. <source>Human Relations</source>, <volume>69</volume>(<issue>3</issue>), <fpage>685</fpage>&#x2013;<lpage>709</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1177/0018726715596802">https://doi.org/10.1177/0018726715596802</ext-link></mixed-citation></ref>
<ref id="R0013"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>K&#x00FC;hn</surname>, <given-names>A.</given-names></string-name></person-group> (<year>2021</year>). <article-title>Institutional complexity and administrative autonomy in multilevel governance</article-title>. <source>Scandinavian Journal of Public Administration</source>, <volume>25</volume>(<issue>3</issue>), <fpage>23</fpage>&#x2013;<lpage>45</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.58235/sjpa.v25i1.7123">https://doi.org/10.58235/sjpa.v25i1.7123</ext-link></mixed-citation></ref>
<ref id="R0014"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Lehtovuori</surname>, <given-names>P.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Ekroos</surname>, <given-names>A.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Kuusela</surname>, <given-names>K.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Rantanen</surname>, <given-names>A.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Rajaniemi</surname>, <given-names>J.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Schmidt-Thom&#x00E9;</surname>, <given-names>K.</given-names></string-name></person-group> (<year>2019</year>). <article-title>Tulevaisuuskatsaus er&#x00E4;iden maiden alueidenk&#x00E4;yt&#x00F6;n suunnitteluj&#x00E4;rjestelmiin</article-title>. <source>Ministry of the Environment</source>.</mixed-citation></ref>
<ref id="R0015"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Lobon&#x021B;</surname>, <given-names>O. R.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Criste</surname>, <given-names>C.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Vintil&#x0103;</surname>, <given-names>A. I.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Cr&#x0103;ciun</surname>, <given-names>A. F.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Moldovan</surname>, <given-names>N. C.</given-names></string-name></person-group> (<year>2025</year>). <article-title>Assessing digital performance of public services in the EU</article-title>. <source>Systems 2025</source>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3390/systems13060425">https://doi.org/10.3390/systems13060425</ext-link></mixed-citation></ref>
<ref id="R0016"><mixed-citation publication-type="other"><person-group person-group-type="author"><string-name><given-names>Ilmajoki</given-names> <surname>Municipality</surname></string-name></person-group>. (<year>2019</year>; 2023a; 2023b). <article-title>Approved detailed plan documents</article-title> [<source>Planning records</source>]. Retrieved from the official approved plans archive, accessed 20 January 2024.</mixed-citation></ref>
<ref id="R0017"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Meijer</surname>, <given-names>F.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Visscher</surname>, <given-names>H.</given-names></string-name></person-group> (<year>2006</year>). <article-title>Deregulation and privatisation of European building control systems&#x003F;</article-title> <source>Environment and Planning B: Planning and Design</source>, <volume>33</volume>(<issue>4</issue>), <fpage>491</fpage>&#x2013;<lpage>501</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1068/b3109">https://doi.org/10.1068/b3109</ext-link></mixed-citation></ref>
<ref id="R0018"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Moghissi</surname>, <given-names>A. A.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Straja</surname>, <given-names>S. R.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Love</surname>, <given-names>B. R.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Bride</surname>, <given-names>D. K.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Stough</surname>, <given-names>R. R.</given-names></string-name></person-group> (<year>2014</year>). <article-title>Innovation in regulatory science</article-title>. <source>Technology &#x0026; Innovation</source>, <volume>16</volume>(<issue>2</issue>), <fpage>155</fpage>&#x2013;<lpage>165</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3727/194982414X14096821477027">https://doi.org/10.3727/194982414X14096821477027</ext-link></mixed-citation></ref>
<ref id="R0019"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>M&#x00E4;ntysalo</surname>, <given-names>R.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Mattila</surname>, <given-names>H.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Hirvola</surname>, <given-names>A.</given-names></string-name></person-group> (<year>2023</year>). <article-title>Institutional Gaps in Agonistic and Communicative Planning Theories: Critical Implications of the&#x2019;Systemic Turn&#x2019;in Deliberative Democracy Theory</article-title>. <source>Raumforschung und Raumordnung/Spatial Research and Planning</source>, <volume>81</volume>(<issue>5</issue>), <fpage>437</fpage>&#x2013;<lpage>448</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.14512/rur.1676">https://doi.org/10.14512/rur.1676</ext-link></mixed-citation></ref>
<ref id="R0020"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Negri</surname>, <given-names>C.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Dinc&#x0103;</surname>, <given-names>G.</given-names></string-name></person-group> (<year>2023</year>). <article-title>Public sector efficiency as a reflection of governance quality: An EU study</article-title>. <source>PLOS ONE</source>, <volume>18</volume>(<issue>9</issue>), e0291048. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1371/journal.pone.0291048">https://doi.org/10.1371/journal.pone.0291048</ext-link></mixed-citation></ref>
<ref id="R0021"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Pedro</surname>, <given-names>J. B.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Meijer</surname>, <given-names>F.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Visscher</surname>, <given-names>H.</given-names></string-name></person-group> (<year>2011</year>). <source>Comparison of building permit procedures in EU countries</source>. <publisher-name>RICS COBRA</publisher-name>.</mixed-citation></ref>
<ref id="R0022"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Peltonen</surname>, <given-names>T.</given-names></string-name></person-group> (<year>2020</year>). <article-title>Regulatiivinen pilari hallinnon institutionaalisessa muutoksessa</article-title>. <source>Hallinnon Tutkimus</source>, <volume>39</volume>(<issue>4</issue>), <fpage>255</fpage>&#x2013;<lpage>270</lpage>.</mixed-citation></ref>
<ref id="R0023"><mixed-citation publication-type="book"><person-group person-group-type="editor"><string-name><surname>Powell</surname>, <given-names>W. W.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="editor"><string-name><surname>DiMaggio</surname>, <given-names>P. J.</given-names></string-name></person-group> (Eds.). (<year>2012</year>). <source>The new institutionalism in organizational analysis</source>. <publisher-name>University of Chicago press</publisher-name>.</mixed-citation></ref>
<ref id="R0024"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Radaelli</surname>, <given-names>C. M.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Meuwese</surname>, <given-names>A. C.</given-names></string-name></person-group> (<year>2009</year>). <article-title>Better regulation in Europe: Between public management and regulatory reform</article-title>. <source>Public Administration</source>, <volume>87</volume>(<issue>3</issue>), <fpage>639</fpage>&#x2013;<lpage>654</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1111/j.1467-9299.2009.01771.x">https://doi.org/10.1111/j.1467-9299.2009.01771.x</ext-link></mixed-citation></ref>
<ref id="R0025"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Ranta</surname>, <given-names>V.</given-names></string-name></person-group> (<year>2021</year>). <source>Strategic development of circular economy business in industrial firms</source>. <comment>Doctoral dissertation</comment>, <publisher-name>Tampere University</publisher-name>.</mixed-citation></ref>
<ref id="R0026"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Rinkinen</surname>, <given-names>S.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Kinnunen</surname>, <given-names>H.</given-names></string-name></person-group> (<year>2017</year>). <source>Asemakaavoituksen seurantalomakkeet 2016 (Reports of the Finnish Environment Institute 23/2017)</source>. <publisher-name>Finnish Environment Institute (Syke)</publisher-name>.</mixed-citation></ref>
<ref id="R0027"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>R&#x00F8;nshaugen</surname>, <given-names>M.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Pierre</surname>, <given-names>J.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>Torfing</surname>, <given-names>J.</given-names></string-name></person-group> (<year>2024</year>). <article-title>Institutional complexity and public-sector coordination</article-title>. <source>Scandinavian Journal of Public Administration</source>, <volume>28</volume>(<issue>2</issue>), <fpage>1</fpage>&#x2013;<lpage>22</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.58235/sjpa.2024.23233">https://doi.org/10.58235/sjpa.2024.23233</ext-link></mixed-citation></ref>
<ref id="R0028"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Scott</surname>, <given-names>W. R.</given-names></string-name></person-group> (<year>2008</year>). <article-title>Approaching adulthood: The maturing of institutional theory</article-title>. <source>Theory and Society</source>, <volume>37</volume>(<issue>5</issue>), <fpage>427</fpage>&#x2013;<lpage>442</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1007/s11186-008-9067-z">https://doi.org/10.1007/s11186-008-9067-z</ext-link></mixed-citation></ref>
<ref id="R0029"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Stramrud</surname>, <given-names>L. K.</given-names></string-name></person-group>, <person-group person-group-type="author"><string-name><surname>Galland</surname>, <given-names>D.</given-names></string-name></person-group>, &#x0026; <person-group person-group-type="author"><string-name><surname>&#x00C5;s</surname>, <given-names>A.</given-names></string-name></person-group> (<year>2017</year>). <source>Rational Planning And Advocacy Planning: A Comparative Essay</source>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.13140/RG.2.2.23060.55681">https://doi.org/10.13140/RG.2.2.23060.55681</ext-link></mixed-citation></ref>
<ref id="R0030"><mixed-citation publication-type="book"><person-group person-group-type="author"><string-name><surname>Sulonen</surname>, <given-names>K.</given-names></string-name></person-group> (<year>2020</year>). <source>Improving efficiency of public cadastral procedures through customer-orientation</source> (<comment>Doctoral dissertation</comment>). <publisher-name>Tampere University</publisher-name>.</mixed-citation></ref>
<ref id="R0031"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Sulonen</surname>, <given-names>Kimmo</given-names></string-name></person-group>; <person-group person-group-type="author"><string-name><surname>Vastam&#x00E4;ki</surname>, <given-names>Jouni</given-names></string-name></person-group> (<year>2021</year>). <article-title>Improving efficiency in Finnish public land use processes &#x2013; regulatory change and digitalisation in focus</article-title>. <source>Nordic Journal of Surveying and Real Estate Research</source> <volume>16</volume>:<issue>1</issue> <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.30672/njsr.49388">https://doi.org/10.30672/njsr.49388</ext-link></mixed-citation></ref>
<ref id="R0032"><mixed-citation publication-type="journal"><person-group person-group-type="author"><string-name><surname>Westin</surname>, <given-names>M.</given-names></string-name></person-group> (<year>2022</year>). <article-title>The framing of power in communicative planning theory: Analysing the work of John Forester, Patsy Healey and Judith Innes</article-title>. <source>Planning Theory</source>, <volume>21</volume>(<issue>2</issue>), <fpage>132</fpage>&#x2013;<lpage>154</lpage>. <ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1177/14730952211043219">https://doi.org/10.1177/14730952211043219</ext-link></mixed-citation></ref>
</ref-list>
<ref-list><title>B) Legislation and official documents</title>
<ref id="R0033"><mixed-citation publication-type="web"><collab>European Union</collab> <year>2010</year>, <source><italic>Directive 2010/31/EU (Energy Performance of Buildings Directive, EPBD)</italic></source>, EUR-Lex, available at: <ext-link ext-link-type="uri" xlink:href="https://eur-lex.europa.eu/homepage.html&#x003F;locale&#x003D;en">https://eur-lex.europa.eu/homepage.html&#x003F;locale&#x003D;en</ext-link></mixed-citation></ref>
<ref id="R0034"><mixed-citation publication-type="web"><collab>European Union</collab> <year>2012</year>, <source><italic>Directive 2012/27/EU (Energy Efficiency Directive)</italic></source>, EUR-Lex, available at: <ext-link ext-link-type="uri" xlink:href="https://eur-lex.europa.eu/homepage.html&#x003F;locale&#x003D;en">https://eur-lex.europa.eu/homepage.html&#x003F;locale&#x003D;en</ext-link></mixed-citation></ref>
<ref id="R0035"><mixed-citation publication-type="web">BA, <source><italic>Building Act (751/2023)</italic></source>, Finlex, available at: <ext-link ext-link-type="uri" xlink:href="http://www.finlex.fi/en/">http://www.finlex.fi/en/</ext-link> Government of Finland 2025.</mixed-citation></ref>
<ref id="R0036"><mixed-citation publication-type="web"><source><italic>Government Proposal (HE 101/1998) to reform the Land Use and Building Act</italic></source>, Finlex, available at: <ext-link ext-link-type="uri" xlink:href="http://www.finlex.fi/en/">http://www.finlex.fi/en/</ext-link> Government of Finland 1998.</mixed-citation></ref>
<ref id="R0037"><mixed-citation publication-type="web"><source><italic>Government Proposal (HE 139/2022) to reform the Land Use and Building Act</italic>,</source> Finlex, available at: <ext-link ext-link-type="uri" xlink:href="http://www.finlex.fi/en/">http://www.finlex.fi/en/</ext-link> Government of Finland 2022.</mixed-citation></ref>
<ref id="R0038"><mixed-citation publication-type="web"><collab>LUBA</collab>, <source><italic>Land Use and Building Act (132/1999)</italic></source>, Finlex, available at: <ext-link ext-link-type="uri" xlink:href="http://www.finlex.fi/en/">http://www.finlex.fi/en/</ext-link> Government of Finland 1999.</mixed-citation></ref>
<ref id="R0039"><mixed-citation publication-type="journal"><italic>YM014:00/2018: Preparation for the overall reform of the Land Use and Building Act</italic>. Ministry of the Environment <year>2018</year>.</mixed-citation></ref>
</ref-list>
<app-group>
<app id="app0001"><label>Appendix A:</label><title><bold>Comparative Process Summary &#x2013; Three Ilmajoki municipality Planning Cases (2019&#x2013;2024)</bold></title><p>This appendix presents a comparative three-case summary of planning processes conducted in Ilmajoki municipality by the same planning unit under the same statutory framework.</p>
<p>Area A (K&#x00E4;p&#x00E4;l&#x00E4;m&#x00E4;ki III residential plan) was prepared before the case-specific process modifications and therefore serves as the baseline case. It followed committee-routed display decisions, no systematic timeframe coordination, and relied on sequential specialist input.</p>
<p>Area B (Koskenkorva plan, case study, initiated in May 2023 and approved in October 2023) and Area C (Peurala plan, comparator, initiated in October 2021 and approved in January 2024) were both processed during the new-methods period, applying delegated official-level display decisions and upstream coordination practices. National statistics from the pre-2022 period (<xref ref-type="bibr" rid="R0026">Rinkinen &#x0026; Kinnunen, 2017</xref>: national median 15.6 months; average 25.7 months) provide the external performance baseline consistent with the Area A approach. All three cases are documented in publicly available planning reports (Ilmajoki <xref ref-type="bibr" rid="R0016">municipality, 2019</xref>; <xref ref-type="bibr" rid="R0016">2023a</xref>; <xref ref-type="bibr" rid="R0016">2023b</xref>).</p>
<table-wrap id="T0003" position="float"><label>Table A1.</label><caption><p><italic>Comparative process summary of three Ilmajoki municipality planning cases. Sources (Ilmajoki Municipality planning documents (Finland), retrieved from the official approved plans archive and municipal records (accessed 20 January 2024)): Area (20 Oct 2019); Area B (9 Aug 2023a); Area C (4 Dec 2023b); and national statistics from</italic> <xref ref-type="bibr" rid="R0026"><italic>Rinkinen &#x0026; Kinnunen (2017)</italic></xref>.</p></caption>
<table><thead>
<tr>
<th valign="top" align="left">Process characteristic</th>
<th valign="top" align="left">Area A residential plan<break/><italic>Previous methods &#x007C; Aug 2018 - Jan 2020</italic></th>
<th valign="top" align="left">Area B school plan amendment<break/><italic>New methods &#x007C; Case study &#x007C; Mar 2022 &#x2013; Oct 2023</italic></th>
<th valign="top" align="left">Area C residential plan extension<break/><italic>New methods &#x007C; Comparator &#x007C; Oct 2021 &#x2013; Jan 2024</italic></th>
</tr></thead>
<tbody>
<tr>
<td valign="top" align="left">Process initiation decision</td>
<td valign="top" align="left">Municipal board formally initiated the plan on 27 Aug 2018 the process was re-initiated on 28 Jan 2019.<break/>No explicit time-critical construction deadline</td>
<td valign="top" align="left">Municipal board formally initiated the plan on 17 May 2023.<break/>Political priority: council school programme decision of 17 April 2023 with a six-month target.</td>
<td valign="top" align="left">Municipal board formally initiated the plan on 11 Oct 2021. The plan was on dormant period and was re-initiated on 18 Oct 2023. Routine land-use development; no stated target schedule or construction deadline</td>
</tr>
<tr>
<td valign="top" align="left">Method for statutory public display decisions</td>
<td valign="top" align="left">Standard committee route: display decisions made at committee/board meetings (&#x007E;8&#x2013;10/year)</td>
<td valign="top" align="left">Delegated official-level decision at both draft and proposal stages; separate political briefings</td>
<td valign="top" align="left">Delegated official-level decision at both stages</td>
</tr>
<tr>
<td valign="top" align="left">Pre-display inter-organisational coordination</td>
<td valign="top" align="left">Formal consultation requests sent after display phases</td>
<td valign="top" align="left">Pre-discussion working meeting corresponding authorities (8 Jun 2023) before draft display; issues resolved upstream</td>
<td valign="top" align="left">Pre-display coordination introduced; some pre-discussion with authorities documented</td>
</tr>
<tr>
<td valign="top" align="left">OAS and draft plan on display</td>
<td valign="top" align="left">Standard sequential procedure; OAS and plan draft displayed in separate phases via committee decisions</td>
<td valign="top" align="left">17.5.&#x2013;22.6.2023 (OAS &#x002B; plan<break/>draft combined display via delegated decision)</td>
<td valign="top" align="justify">18.10.&#x2013;1.11.2023 (delegated decision; OAS and plan draft displayed together)</td>
</tr>
<tr>
<td valign="top" align="left">Proposal (draft) on display</td>
<td valign="top" align="left">Standard procedure via committee decision</td>
<td valign="top" align="left">16.8.&#x2013;18.9.2023 (delegated official-level decision)</td>
<td valign="top" align="left">7.12.2023&#x2013;8.1.2024<break/>(delegated official-level decision)</td>
</tr>
<tr>
<td valign="top" align="left">Approval decision</td>
<td valign="top" align="left">27 January 2020, Municipal board</td>
<td valign="top" align="left">9 October 2023, Municipal board</td>
<td valign="top" align="left">15 January 2024, Municipal board</td>
</tr>
<tr>
<td valign="top" align="left">Formal statements at draft stage</td>
<td valign="top" align="left">Three statements from private participants.</td>
<td valign="top" align="left">Two statements: (non-objecting, key issues pre-resolved on 8 Jun 2023)</td>
<td valign="top" align="left">Three statements with substantive requests: all required additions or clarifications to the plan. The plan area was partially on structurally unstable riverbank,</td>
</tr>
<tr>
<td valign="top" align="left">Late-stage iterations after proposal display</td>
<td valign="top" align="left">Two drafts versions of the plan was made.</td>
<td valign="top" align="left">No substantive revisions; no objections filed; minor technical additions only (groundwater clauses)</td>
<td valign="top" align="left">Multiple substantive additions required: cultural heritage assessment, flood risk clarification, building quality provisions, area scope reduced from 2.2 to 1.7 ha</td>
</tr>
<tr>
<td valign="top" align="left">Project type and complexity</td>
<td valign="top" align="left">Residential plan extension in urban area district; new residential building plots on municipal land; no atypical constraints</td>
<td valign="top" align="left">Plan amendment: existing residential blocks (AO) to school use (YO); 3.8 ha; municipal land; no private developer conflict; acid sulphate soil and groundwater present but managed</td>
<td valign="top" align="left">New plan extension into previously unplanned riverbank area; 1.7 ha after scope reduction; slope stability, flood risk, and cultural heritage issues all raised during process</td>
</tr>
<tr>
<td valign="top" align="left">Appeals filed</td>
<td valign="top" align="left">None</td>
<td valign="top" align="left">None</td>
<td valign="top" align="left">None</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>The comparison supports three analytical conclusions. First, the Area B case achieved a substantially shorter lead time than the previous-methods baseline (Area A/national average). The delegated display procedure and the aforementioned new-methods contributed to both. Second, the Area B achieved a shorter lead time than Area C, indicating that comprehensive upstream coordination with relevant authorities and stakeholders is a necessary complement to aforementioned methods. Third, the difference between Area B and Area C cannot be attributed to project type alone: both involved municipal land, the same statutory framework and comparable overall complexity, while the principal observable difference lies in the comprehensiveness of upstream pre-display coordination.</p>
<p>Read as a rival-explanations test, the comparison also shows why contextual conditions are insufficient as stand-alone accounts. Area B combined political priority and relatively low contestation with specific process redesigns, whereas the comparator cases indicate that delegated procedure alone, or routine municipal handling without comprehensive upstream coordination, did not produce the same degree of compression. The appendix therefore supports an asymmetric conclusion: contextual factors facilitated acceleration, but the institutional mechanisms explain the observed pattern of reduced waiting time and fewer late-stage iterations.</p>
</app>
<app id="app0002"><label>Appendix B:</label><title>Cultural&#x2013;Cognitive Pillar &#x2013; Documentary Indicators of Routinisation</title><p>This appendix presents the documentary evidence base for the cultural&#x2013;cognitive pillar claims made in the main analysis. Each indicator is grounded in the Area B planning documents (Ilmajoki municipality, 9 Aug 2023) and related process records. Cultural&#x2013;cognitive elements are inferred conservatively from documentary traces: such inferences are made only where the documentary record directly supports a conclusion about routinisation or a shift in taken-for-granted assumptions. These indicators were absent from the Area A documentation, consistent with the interpretation that they represent a genuine institutional shift introduced in the study case.</p>
<table-wrap id="T0004" position="float"><label>Table B1.</label><caption><p><italic>Documentary indicators of cultural&#x2013;cognitive routinisation in the Ilmajoki municipality detailed plan process (Area B case: 9 Aug 2023); Ilmajoki municipality process records (2023a).</italic></p></caption>
<table><thead>
<tr>
<th valign="top" align="left">Indicator</th>
<th valign="top" align="left">Document source (Area B plan documents, 9 Aug 2023)</th>
<th valign="top" align="left">Evidence content</th>
<th valign="top" align="left">Cultural&#x2013;cognitive significance</th>
</tr></thead>
<tbody>
<tr>
<td valign="top" align="left">Structured pre-discussion with correspondence state authorities (working meeting 8 Jun 2023)</td>
<td valign="top" align="left">Internal meeting memo and formal statement of corresponding state authority (22 Jun 2023); plan documents section 4.3.1: documenting the topics discussed and the resolutions reached</td>
<td valign="top" align="left">Meeting held before formal draft display. Topics: groundwater protection zone, acid sulphate soil measures, traffic study scope, fuel storage proximity, minor plan amendment eligibility. corresponding state authority&#x2019;s formal statement was brief and non-objecting, consistent with pre-resolved issues.</td>
<td valign="top" align="left">Anticipatory problem-solving: issues were framed as resolvable upstream. Trust and role clarity: the correspondent government authority treated the working meeting as sufficient for aligning interpretations before the formal consultation stage.</td>
</tr>
<tr>
<td valign="top" align="left">Delegated display decisions (both draft and proposal stages)</td>
<td valign="top" align="left">Administrative rule enabling official-level decisions on public display; referenced in plan documents section 2.1 (process timeline) and section 4.4</td>
<td valign="top" align="left">Delegation applied consistently at both display stages (17.5.&#x2013;22.6.2023 and<break/>16.8.&#x2013;18.9.2023) without ad hoc justification in each instance. Separate political briefings documented as routine.</td>
<td valign="top" align="left">Institutionalised routine: delegation treated as the default for display decisions, reflecting a shifted taken-for-granted assumption about who authorises public display. Not present in Area A (pre-2022 standard method).</td>
</tr>
<tr>
<td valign="top" align="left">Project-based critical-path schedule</td>
<td valign="top" align="left">Internal project schedule document; specialist participation records across process phases in plan documents sections 3&#x2013;4; traffic study commissioned in parallel with draft display</td>
<td valign="top" align="left">Specialist input (technical director, building inspector, infrastructure engineer, surveyor) documented across multiple phases. Traffic study (Ramboll) commissioned during draft display phase, not after proposal stage.</td>
<td valign="top" align="left">Taken-for-granted assumption: planning was managed as a project with a critical path, rather than as a sequence of independent tasks. Continuous involvement reduced re-familiarisation costs under constrained resources.</td>
</tr>
<tr>
<td valign="top" align="left">Political briefings (separate from formal display, recurring)</td>
<td valign="top" align="left">Process timeline in plan documents section 2.1; board minutes; responses indicating regular information sharing with political actors</td>
<td valign="top" align="left">Political briefings documented as recurring practice after each display stage. Board approval (9.10.2023) was uncontested, consistent with decision-makers who had received regular process updates.</td>
<td valign="top" align="left">Routinisation: a stable, recurring format substituted for case-by-case political handling at committee stage. This supported the legitimacy of delegated display decisions by maintaining political transparency.</td>
</tr>
</tbody>
</table>
</table-wrap>
<p>Overall, these indicators demonstrate that the cultural&#x2013;cognitive pillar was operationalised through recurring, documentable practices that progressively normalised anticipatory problem-solving and structured interaction as the taken-for-granted way of conducting detailed planning in case examples during in 2022-2024. The shift from episodic to continuous specialist involvement and from reactive to proactive coordination is traceable across the process timeline in <xref ref-type="table" rid="T0001">Table 1</xref> and corroborated by the documentary evidence presented here.</p>
</app>
</app-group>
</back></article>